RCC BRIDGE
RIDF (BRIDGES)
List of Incomplete / In Progress Bridges under RIDF
Sl. No. Name of Project Division RIDF Trenche/ Year of Sanction Project Cost (in Lakh) Stipulated Time for Completion
1 2 3 4 5 7
1 RCC Bridge over river Manu on Sonaimuri-Telia road Kumarghat 2008-2009
RIDF-XIV
1771.20 28.12.2023
2  RCC Bridge on Dharmanagar College road near water supply plant at Ch.1.14 km Dharmanagar 2009-2010
RIDF-XV
541.00 05.08.2012
3  RCC bridge over local cherra on Jatanbari to Lambacherra road at ch:10.00km.  Amarpur 2010-2011
RIDF-XVI
378.70 11.05.2022
4 RCC bridge   over local cherra on Jatanbari to Lambacherra road at Ch: 9.70 km. Amarpur 2011-2012
RIDF-XVII
541.00 11.05.2022
5 RCC Bridge over chellagang kurma cherra on the road barmatilla road to chellagang at ch 2.00km. 2-span Amarpur 2014-15
RIDF-XX
432.80 06.04.2019
6 RCC bridge on Nadiapurbazar- Old NEC road via Saidacherra at ch.3.00 Km Kumarghat 2014-15
RIDF-XX
432.80 22.02.2022
7 RCC bridge on Nadiapurbazar- Old NEC road via Saidacherra at ch. 0.25 Km Kumarghat 2014-15
RIDF-XX
270.50 02.03.2022
8 RCC Bridge over sarma river at 30(Thirty) Card on Gandacherra-Amarpur road.(Ch.1.50 Km) Ambassa 2014-15
RIDF-XX
486.90 30.12.2023
9 RCC Bridge over sarma river at Bankarghat on Bankarghat road(Ch.1.00 Km) . Ambassa 2014-15
RIDF-XX
486.90 23.09.2023
10 RCC Bridge over Thakura Cherra on Gandacherra-Raishyabari road.(Ch.7.50 Km Ambassa 2014-15
RIDF-XX
378.70 29.11.2023
11  RCC Bridge over Thakur Cherra on the road from Jolaibari-Hrishyamukh road at ch.-2.70 Km.  Santirbazar 2014-15
RIDF-XX
270.50 29.09.2022
12  RCC bridge over local cherra near Hrishyamuka Block Office on the road from Belonia – Nalua Road to Hrishyamuka Block. Belonia 2015-16
RIDF-XXI
270.50 30.03.2024
13 RCC Bridge over Bet cherra on the road from Chellagang to Karbook at Chaitraham para at 0.50 km. 3-span( Amarpur 2015-16
RIDF-XXI
541.00 29.12.2020
14 RCC bridge on the road from Kanchanpur to Dasda at Ch. 3.00 Km. Kanchanpur 2017-18
RIDF-XXIII
541.00 02.07.2024
15 RCC Bridge over Waimbookcherra on the road from Damcherra to Khedacherra Kanchanpur 2017-18
RIDF-XXIII
162.30 13.04.2022
16 RCC  Bridge at Chaintail ferrighat over river Manu (Ch.2035 Km.) Kailasahar 2017-18
RIDF-XXIII
1731.20 11.06.2022
17 RCC bridge over Halai cherra Kailashahar Golakpur –N.C Para road(Ch.-6.90Km) Kailasahar 2017-18
RIDF-XXIII
411.16 25.04.2023
18 RCC Steel truss Bridge over river Manu at Jalai Village near Jalai bazaar Kailasahar 2017-18
RIDF-XXIII
1514.80 05.07.2023
19 RCC Bridge over Gomati on Amarpur-Mailak road at Ch.-00.30Km.  Amarpur 2017-18
RIDF-XXIII
995.44 13.08.2021
20  RCC Bridge over Muhuri river on the road from Kowaifung to Panjirai at Ch.-22.25Km.  Santirbazar 2017-18
RIDF-XXIII
541.00 24.10.2021
21 RCC Bridge over Ghoramara cherra at Ranirbazar Jirania 2018-19
RIDF-XXIV (Gap grant)
148.58 31.03.2023
  Total     12847.98  
RCC BRIDGE
  Annexure-A
ACTION PLAN FOR RCC BRIDGE TO BE SPILLED OVER TO NEXT YEAR
Sl No. Name of work Source of fund Date of W.O issued Stipulated date of completion Present status
1 Replacement of existing SPT Bridge by RCC Bridge over river Kakri on the road from DT to Dupirbondh Panchayet Office near  Krishanapur H.S. School. (RIDF-XVIII) RIDF-VIII 31-05-2019 13-12-2019 Balance work. Dismentalling of earlier deck slab has not yet been completed.
2 Constn. of RCC bridge on the road from Dharmanagar College road near water supply plant at Ch.1.14 km Agency:-EDCL RIDF-XV 30-06-2010 June, 2012 2 abutments and 1 pier completed. Piles of another pier completed
3 RCC Bridge over river Deo at Buraighat on Gachiram to Tuisama at Ch:1.00Km.  2-span(TSP)
Agency:-Sri.Sunit Das
RIDF-XII   Nov, 2018 Stagging for 1 span of deck slab casting in progress
4 Construction of RCC bridge on the road from Kanchanpur to Jalabassa road at Ch.27.50 km Agency:-EDCL. 3-span (General) RIDF-XV 30-06-2010 June, 2012 Opened for traffic
5 Replacement of Bailey by RCC bridge over Ratacherra on MDF road  in between Kanchanbari to Chowmuhani Bazar. Agency:-sri Bhanu Bhusan Deb. 2-pan (General) RIDF-XX 15.06.17 15.06.19 Super structure in progress.
6 Replacement of SPT bridge No.1 at Laljuri cherra Ch.0.10 Km MDF- Laljuri road.Agency: Bhanu Bhusan Deb. Single span(General) RIDF-XX 04-01-2018 31-03-2021 Opened for traffic
7 Replacement of Bailey by RCC bridge overJuraicherra on MDF road  in between Fatikroy to Chowmuhani Bazar. Agency:-Sri Bhanu Bhusan Deb. Span-2 RIDF-XX 06.01.17   Abutments and pier completed. stagging for deck slab in progress.
8 Const.of RCC Bridge over river khowai on the road from Teliamura (Dasamighat) to Baishgaria under Teliamura Block Agency:-M/S.Simplex Projects Limited RIDF-XIV 18-07-2011 30-09-2020 Super structure work complete. land dispute solved. approach work in progress.
RIDF-XIV 16-09-2019 30-09-2020
9 Construction of RCC bridge at ch 6.00 Km near Champahour on the road from Khowai to Champahour (9.50 Km) Agency:-Sri.Prafulla Das RIDF-XV 27-05-2017 11-12-2018 Opened for traffic
10 Construction of RCC bridge over local cherra on the road from Chittamara to Joyharipara (L032) (Span 2x25.00 Mtr.) at Ch. 0.475 km. Agency: Pankaj Mallik. Span-3 RIDF-XXI 09.08.19 23.08.21 3 Nos. Pile cap completed and 1 No. Pier wall is in progress.
11 Constn. Of  RCC bridge over local cherra on the road from Mandarai to Jasmura (Span = 35.00 mtr). Agency:-Sri.Gopi Nandan Dey RIDF-XXI 15.12.17 22.06.19 Abutment completed. Stagging in progress for deck slab casting..
12 Const. Of Steel Bridge over Abhya cherra on Barpathari to Tulamura road at Ch:4.50 km Agency:-Sri. Subhash Podder RIDF-XII 06.06.14 20.12.15 Bridge collapsed on 09.07.2020. Proposal for rescission of contract has been approved.
13 Replacement of Bailey Bridge by RCC Bridge over Champa cherra on Moithulong to Thelakum  road at Ch. 2.80 Km. .(Job No.TP/COM/30/2013-14). Agency:-Sri.Sankar Kanti Saha. 2-span. RIDF-XX 07.09.2017 21.03.2019 Garder Completed & Deckslab work in progress.
14 Replacement of existing  Bailey Bridge (TSR) at Dakshin Mirza under Kakraban Block / Constn. Of  RCC Bridge over Local Cherra at Ch. 2.20 Km. On Mirza to Samukcherra road. .(Job No.TP/COM/31/2013-14). Agency:-Sri.Dipak Paul. 2-span. RIDF-XX 21.11.2017 05.12.2019 Open for traffic.
15 Construction of RCC bridge (L=35 m) over Leba cherra on the road from Natunbazar to Lebacherra  at ch:2.50 km. [Job No.TP/COM/13/2013-14] Agency:- Sri. Binay Saha. Single span(TSP) RIDF-XIX 09-08-2016 24-02-2018 Sub-structure complete. super structure work started
16 Replacement of Bailey Bridge by RCC Bridge over Bet cherra on the road from Chellagang to Karbook at Chaitraham para at 0.50 km. Agency: Dipak paul.3-span(TSP) RIDF-XXI 18-06-2019 03-07-2021 Pile and pile cap work in progress
17 Replacement of of existing Bailley bridge by RCC bridge over Sagalnaiya  cherra on the road from Poangbari to Madhabnagar at ch.4.00km near Samarganja Bazar.Agency:-Sri Bimalendu Chakraborty (General) RIDF-XX 02-01-2018 02-01-2020 Opened for traffic
18 Replacement of  existing Bailley bridge by RCC bridge over Potha cherra on the road from Manubazar to Srinagar at ch.0.20 km.Agency:-Sri Bimalendu Chakraborty (SCSP) RIDF-XX 02-01-2018 16-01-2020 Opened for traffic.
19 Replacement of bailey bridge over Ailmara charra on the road from Sabroom to Baishnabpur at ch. 6.00 Km Agency:-Sri Jahar lal Sarkar (TSP) RIDF-XX 02-01-2018 16-01-2020 Bridge work completed.
20 Constr. Of RCC bridge over river Manu on the road From Bankul Budhamandir to Hazarai para at ch. 0.10 Km.
Job No. TP/COM/19/2014-15. Agency : Tapesh Debnath. (TSP)
RIDF-XX 29-12-2018 11-01-2021 Bridge work completed.
21 iii)RCC Bridge over Manu river on the road from  Bankul to Bagmara road at Ch:0.20 km.Job No.TP/COM/52/2012-13[Span =30.00m] Agency:-Sri Subash Ch.Datta.2-span (TSP) RIDF-XVIII 18-09-2014 02-10-2016 Bridge work completed
22 Replacement of Bailey Bridge by RCC Bridge over Pilak Cherra on the road from Jolaibari-Kowaifung to NH44 via Banik Para at Ch-0.030 KM. Agency:-Sri Pankaj Mallick. 2-span (TSP) RIDF-XX 02-05-2017 17-11-2018 Bridge work completed. approach road in progress
23 Replacement of Bailey Bridge by RCC Bridge over Ranga Cherra on the road from Jolaibari-Kowaifung to Purba Pilak at ch.-0.040 KM. Agency:-Sri Pankaj Mallick. 2-span(TSP) RIDF-XX 06-04-2017   Dack slab of 1 span completed. Girder casting completed of another span.
24 Construction of RCC Bridge over Sankuma cherra at Ch.2.00 Km.over Jampaijala bazaar to Sambaria bazaar via Natunnagar.
Agency: Tapan Saha
RIDF-XXI 24-08-2018 08-09-2020 Placing of Reinforcement for Top Slab is in progres & likely to be catsted in next 10 days
25 RCC Bridge over Gandacherra on the road from Gandacherra to Raishyabari Agency:-Sri.R.N Ghosh (Tsp) RIDF-XII 20-11-2013 04-06-2015 Soffit slab completed. Two nos long girder completed out of three.
26 Const. of RCC Bridge on Chailengta- Chowmanu road.(RIDF-XIV). Span-3 (TSP). Agency: Subhash Poddar.
i] Over Durga Cherra at Ch:6.85 km (Span-32.00m)
RIDF-XIV 29/02/ 2020. 14-09-2021. Deck slab completed. Approach work in progress.
27 Const. of RCC Bridge on Chailengta- Chowmanu road.(RIDF-XIV)
iii] Over local Hazacherra at Ch:9.35km(Span-30.00m) Agency:-Sri. Ashes Deb.
RIDF-XIV 29/02/ 2020. 14-09-2021. Rod binding for Deck slab in progress. Work order issued for approach road.

 

  Annexure-B
ACTION PLAN FOR RCC BRIDGE  TO BE SPILLED OVER TO NEXT YEAR
Sl No Name of work Source of fund Date of W.O issued Stipulated date of completion Present status
1 Replacement of Bailey by RCC bridge on the road from Dasda Bazar to Adibasighta at ch. 1.20 km over Deo river. 2-span. RIDF-XXIII     Tendering stage
2 Replacement of Bailey by RCC bridge on the road from Kanchanpur to Dasda at Ch. 3.00 Km. RIDF-XXIII     do
3 Replacement of Bailey by RCC bridge on the road from Damcherra to Jalabassa over piplacherra RIDF-XXIII     work in progress for sinking of piles
4 Replacement of Bailey by RCC bridge over Waimbookcherra on the road from Damcherra to Khedacherra  RIDF-XXIII     do
5 Replacement of SPT bridge no-2  ch-3.00 km by RCC bridge on Nadiapurbazar- Old NEC road via Saidacherra Agency:-Sri. Bhanu Bhusan Deb. RIDF-XX 16-08-2019 30-09-2021 Piles completed
6 Construction of RCC Bridge over river Manu on Sonaimuri-Telia road(RIDF-XIV)
Agency:- Sri.Ashes Deb
RIDF-IV 06.01.17 20.01.19 tender under process
7 Replacement of SPT bridge no-1  ch-0.250 km by RCC bridge on Nadiapurbazar- Old NEC road via Saidacherra. Span-2 RIDF-XX 21-11-2017    W/Oissued 
8 Construction of RCC Bridge  over Manu at Chaintail ferrighat on Paiturbazar – Sunamara road(Ch.2035 Km.)(General) RIDF-XXIII 29/05/2020   Pile work in progress
9 Replacement of Bailey by RCC bridge over Halai cherra on Kailashahar Golakpur –N.C Para road(Ch.-6.90Km) RIDF-XXIII     Tender accepted. W/O to be issued on receipt of BG
10 Replacement of of Cable Suspension Bridge by RCC Steel truss Bridge over river Manu at Jalai Village near Jalai bazaar RIDF-XXIII     Tender received
11 Construction of RCC Bridge of over river Khowai at Ch:0.75Km. on the road from Seoratali to Paharmura (L=6.10Km)  Agency:-Simplex Projects Ltd RIDF-XIV 09-10-2010 09-10-2012 Work rescinded. Tender to be invited for balance work
12 Replacement of Bailey Bridge by RCC bridge over Kalsi Cherra on Bagafa to Gobinbari via Akhangama at Ch:- 14.00 Km. Agency:- Tripura Development Corporation Ltd. (TSP) RIDF-XX 24-03-2020 08-04-2022 Piles of one abutment complete, work in progress
13 Replacement of Bailey Bridge by RCC Bridge over Muhuri river on the road from Kowaifung to Panjirai at Ch.-22.25Km. Agency: Jahar lal Sarkar. 2-span(TSP) RIDF-XXVIII 10-10-2019 25-10-2021 Diversion work in progress
14 Replacement of Bailey Bridge by RCC Bridge over Thakur Cherra on the road from Jolaibari-Hrishyamukh road at ch.-2.70 Km. Agency:-Sri.Jayanta Chakraborty. RIDF-XX     Diversion of bridge work started
15 Replacement of Bailey Bridge by RCC Bridge over Borpatirai Cherra on the road from Panjirai at Ch-3.25 Km. 2-span(TSP) RIDF-XX     12 Nos. pile completed out of 20
16 Constn. Of RCC bridge (Span = 25.00 mtr) over local cherra near Hrishyamuka Block Office on the road from Belonia – Nalua Road to Hrishyamuka Block RIDF-XXIII     Tender accepted. W/O to be issued on receipt of BG
17 Replacement of Bailey Bridge by RCC Bridge over Dewan Cherra on Pitra to Nityabazar road at Ch. 0.180 Km.(Job No.TP/COM/28/2013-14) 2-span (TSP). Agency : Prhallad Saha RIDF-XX 10-06-2020   Pile work in progress
18 Replacement of Bailey bridge by RCC Bridge over Gangachera at Ch.3.110 Km. Of Dataram to Maidabari road. .(Job No.TP/COM/32/ 2013-14). 2-span(TSP) Agency: Sankar Kanti Saha. RIDF-XX     Pile work completed
19 Replaicement of bailey bridge by RCC bridge over chellagang kurma cherra on the road barmatilla road to chellagang at ch 2.00km. Agency:-Sri.Shambhu Pau. 2-span (TSP) RIDF-XX 21-11-2017 06-06-2019. Abutments completed, pier work in progress
20 Replacement of SPT Bridge by RCC Bridge (Length=50.00meter) over Mailak Cherra on the road Mailak Panchayet office to East Malabassa at Ch:1.50Km,(Job No.TP/COM/33/2014-15. Agency: TDC Ltd. (SCSP) RIDF-XX     piles completed
21 Replacement of Baily Bridge by RCC Bridge (Length=50.00meter) over local Cherra on Jatanbari to Lambacherra road at Ch.18.60Km. (TSP) RIDF-XVII     Dropped vide Letter No. F. 3(23)/PC(RDQP)/2015-16/694-700, dated 16 June, 2020.
22 Replacement of Baily Bridge by RCC/Steel girder Bridge over river Gomati at Mailak from Amarpur-Mailak road at Ch.-00.30Km. Name of agency: Tapesh Debnath. 2-span (General) RIDF-XXIII 30-07-2019 14-08-2021 Piles of 2 abutmentsanf 2  piers completed.
23 Replacement of Bailey Bridge by RCC bridge   over local cherra on Jatanbari to Lambacherra road at Ch: 9.70 km.  [Job No-TP/COM/38/2011-12] . Agency: TDC Ltd, (TSP0 RIDF-XVII     pile work in progress.
24 Replacement of Bailey Bridge by RCC bridge  over local cherra on Jatanbari to Lambacherra road at ch:10.00km.  [Job No-TP/COM/39/2011-12] (TSP) RIDF-XVII     pile work in progress.
25 Replacement of of existing Bailley bridge by RCC bridge over Betaga cherra on the road from Manubazar to Srinagar at ch.3.50 km. Agency: Bimalendu Chakraborty (TSP) RIDF-XX     Pile work in progress
26 Replacement of Baily Bridge by RCC Bridge over local Cherra on Jatanbari to Lambacherra road at Ch.14.80Km. (TSP) RIDF-XVII     Tendering stage
27 Replacement of bailey bridge by RCC bridge over sarma river at 30(Thirty) Card on Gandacherra-Amarpur road.(Ch.1.50 Km) Agency:-Sri.Asesh Deb. (TSP) RIDF-XX     tender invited
28 Replaicement of bailey bridge by RCC bridge over sarma river at Bankarghat on Bankarghat road(Ch.1.00 Km) . RIDF-XX     tender invited
29 Replacement of bailey bridge by RCC bridge over Thaura Cherra on Gandacherra-Raishyabari road.(Ch.3.50 Km). Agency:-Sri Sunit Das RIDF-XX 25-10-2017 10-05-2019 pile work completed. pile cap work in progress
30 Replacement of bailey bridge by RCC bridge over Thakura Cherra on Gandacherra-Raishyabari road.(Ch.7.50 Km) RIDF-XX     tendering stage
31 Construction of RCC Bridge over Raima river on Ganacherr-Raishyabari road(Ch.-19.320 Km.) under PWD(R&B) Gandacherra Sub-Division (TSP) RIDF-XXVIII     tendering stage
32 Replacement of Baily Bridge by RCC Bridge over Baiboon cherra on Bankumari to Manikpur road at Ch.-6.20Km. Single span (TSP). Agency : Bhanu Bhusan Deb. RIDF-XXVIII 29-05-2020 24 months pile work in progress
33 Const. of RCC Bridge on Chailengta- Chowmanu road.(RIDF-XIV)  3-span(TSP)
ii] Over Guri Cherra at Ch: 8.35 km (Span-40.00m)
RIDF-XIV 29/02/ 2020. 14-09-2021. pile cap work in progress
34 iii)Malidhar Cherra on the road from Kacharicherra TSR camp to Kacharicherra regrouping centre road at Ch:0.21Km(Length=60.00m) RIDF-XVIII   18 Months pile cap work in progress
35 Replacement od bailey bridge by RCC bridge over Ghoramara cherra at Ranirbazar (Balance work) RIDF-Gap fund     Tender accepted. 

 