1

XII

Over Abhayacherra on Barapathari to Tulamura road at ch. 4.50 km

371.50

297.20

74.30

Super-Structure work in progress.

2

XIII

Constn. Of RCC Bridge Over river Deo on at Buraighat on Gachiram to Tuisama at ch. 1.00 km

530.25

477.23

53.02

Substructure work in progress.

3

XIII

Constn. Of RCC Bridge Over river Deo on Gopalpur to Shibnagar road at ch. 0.05 km

318.15

286.34

31.81

One span completed out of three.

4

XIV

Replacement of existing SPT Bridge over river Burima by RCC Bridge on the road from Bishalgarh Golaghati road (Near Gandhi Home) to Nabasantiganj

688.80

619.92

68.88

Carpetting completed except drain work in progress although delayed due to COVID-19.

5

XIV

Constn. Of RCC bridge over river Khowai on the road from Teliamura (Dasamighat) to Baishgharia under Teliamura Block. (Span: 140 M)

1377.60

1239.84

137.76

Deck slab completed and balance work in progress. And for apprach road formation work is in progress, possesion for 150 m land is yet to be finalised due to lockdown.

6

XIV

Construction of RCC Bridge over river Manu on Sonaimuri - Telia road

1771.20

1594.08

177.12

66 nos piles completed.

7

XIV

RCC Bridge at Durgachera, Ch. 6.85 Km on Chailengta- Chawmanu road 

314.88

283.39

31.49

Abutment work completed. Balance work in progress.

8

XIV

RCC Bridge at Gurucharancherra, Ch. 8.35 Km on Chailengta- Chawmanu road.

393.60

354.24

39.36

Pilining completed for 32 nos. 3rd call tender received for balance work

9

XIV

RCC Bridge at Hazarcherra, Ch. 9.35 Km on Chailengta-Chawmanu road.

295.20

265.68

29.52

Abutment 7 pier work completed. Balance work in progress.

10

XV

Construction of RCC Bridge on Dharmanagr College road near water supply plant at ch. 1.14 km

541.00

486.90

54.10

In progress.

11

XV

Construction of RCC Bridge near Champahour on the road from Khowai to Champahour (9.50 km).

378.70

340.83

37.87

Superstructure in progress.

12

XVII

Construction of RCC Bridge over Ghoramaracherra at Aujendrabazar

324.6

292.14

32.46

Bridge Completed and approach 80% completed.

13

XVII

Replacement of Bailey Bridge by RCC bridge over local cherra on Jatanbari to Lambacherra road at ch. 9.70 km

541.00

486.900

54.100

Work order cancelled and tender under scrutiny..

14

XVII

Replacement of Bailey Bridge by RCC bridge over local cherra on Jatanbari to Lambacherra road at ch. 10.00 km

378.70

340.830

37.870

Work order cancelled and tender under scrutiny..

15

XVII

Replacement of Bailey Bridge by RCC bridge over local cherra on Jatanbari to Lambacherra road at ch. 12.00 km

259.68

233.712

25.968

Box cell being completed.

16

XVII

Replacement of Bailey Bridge by RCC bridge over local cherra on Jatanbari to Lambacherra road at ch. 14.80 km

238.04

214.236

23.804

Work order cancelled and tender re-invited.

17

XVII

Replacement of Bailey Bridge by RCC bridge over local cherra on Jatanbari to Lambacherra road at ch. 18.60 km

541.00

486.900

54.100

No bidder found in 4th call & tender re-invited.

18

XVIII

Replacement of existing Bailey Bridge over Manu river on the road from Bankul to Bagmara road at ch. 0.20 km.

324.6

292.14

32.46

Stagging of deck slab completed.

19

XVIII

Replacement of existing SPT Bridge by RCC Bridge over Malidhar Cherra on the road from Kacharicherra TSR camp to Kacharicherra regrouping centre road at ch. 0.21 km.

378.7

340.83

37.87

Work rescined & tender invited for balance work.

20

XVIII

Replacement of existing SPT Bridge by RCC Bridge over river Kakri on the road from DT road to Dupirbondh Panchayet Office near Krishnapur H.S. school.

432.8

389.52

43.28

Work in progress.

21

XVIII

Replacement of existing SPT Bridge by RCC Bridge over river Kakri on the road from DT road to Dupirbondh Panchayet Office near Raj Brick Klin.

454.44

409

45.44

Work in progress.

22

XIX

Replacement of Bailey Bridge by RCC Bridge over Lebacherra on the road from Nutanbazar to Lebacherra at ch. 2.50 km

367.88

331.09

36.79

Sub-structure work in progress.

23

XX

Constr. Of RCC bridge over river Manu on the road From Bankul Budhamandir to Hazarai para at ch. 0.100Km

378.70

340.83

37.870

Stagging of deck slab completed.

24

XX

Replacement of of existing Bailley bridge by RCC bridge over Potha cherra on the road from Manubazar to Srinagar at ch.0.20

270.50

243.45

27.050

Staging of deck slab in progress.

25

XX

Replacement of of existing Bailley bridge by RCC bridge over Betaga cherra on the road from Manubazar to Srinagar at ch.3.50

270.50

243.45

27.050

Piling work started.

26

XX

Replacement of bailey bridge over Ailmara charra on the road from Sabroom to Baishnabpur at ch. 6.00 Km

346.24

311.62

34.620

Stagging of deck slab completed.

27

XX

Replacement of Bailey Bridge by RCC Bridge over Thakur Cherra on the road from Jolaibari-Hrishyamukh road at ch.-2.70 Km

270.50

243.45

27.050

Work order issued.

28

XX

Replacement of Bailey Bridge by RCC bridge over Kalsi Cherra on Bagafa to Gobinbari via Akhangama at Ch:- 14.00 k.m

541.00

486.90

54.100

Initial load test completed of test pile.

29

XX

Replacement of Bailey Bridge by RCC Bridge over Ranga Cherra on the road from Jolaibari-Kowaifung to Purba Pilak at ch.-0.040 KM

346.24

311.62

34.620

1(one) span of deck slab completed. Work in progress

30

XX

Replacement of Bailey Bridge by RCC Bridge over Pilak Cherra on the road from Jolaibari-Kowaifung to NH44 via Banik Para at Ch-0.030 KM.

378.70

340.83

37.870

1(one) span of deck slab completed. Work in progress

31

XX

Replacement of Bailey Bridge by RCC Bridge over Borpatirai Cherra on the road from Panjirai at Ch-3.25 Km

432.80

389.52

43.280

Work order issued. Site handed over.

32

XX

Replacement of Bailey Bridge by RCC Bridge over Champa cherra on Moithulong to Thelakum  road at Ch. 2.80 Km.

324.60

292.14

32.460

Staging of deck slab in progress.

33

XX

Replacement of Bailey bridge by RCC Bridge over Gangachera at Ch.3.110 Km. of Dataram to Maidabari road.

421.98

379.78

42.200

Work in progress.

34

XX

Replaicement of SPT bridge by RCC bridge over Mailak cherra on the road Mailak panchayet office to East Malbassa at ch 1.50km.

378.70

340.83

37.870

Piling work started.

35

XX

Replaicement of bailey bridge by RCC bridge over chellagang kurma cherra on the road barmatilla road to chellagang at ch 2.00km.

432.80

389.52

43.280

In progress.

36

XX

Replaicement of bailey bridge by RCC bridge over sarma river at 30(Thirty) Card on Gandacherra-Amarpur road.(Ch.1.50 Km) 

486.90

438.21

48.690

6th call of tender to be cancelled..

37

XX

Replaicement of bailey bridge by RCC bridge over sarma river at Bankarghat on Bankarghat road(Ch.1.00 Km)

486.90

438.21

48.690

4th call of tender under scrutiny. 

38

XX

Replaicement of bailey bridge by RCC bridge over Thakura Cherra on Gandacherra-Raishyabari road.(Ch.7.50 Km)

378.70

340.83

37.870

8th call to be cancelled.

39

XX

Replaicement of bailey bridge by RCC bridge over Thaura Cherra on Gandacherra-Raishyabari road.(Ch.3.50 Km).

454.44

409.00

45.440

6(six) nos. pile completed and work In progress.

40

XX

Replacement of SPT bridge no-1 over laljuricherra ch-0.100 km by RCC bridge on MDF- Laljuri road

238.04

214.24

23.800

Abutment completed. work in progress.

41

XX

Replacement of SPT bridge no-1  ch-0.250 km by RCC bridge on Nadiapurbazar- Old NEC road via Saidacherra.

270.50

243.45

27.050

Work rescinded and single tender for balance work.

42

XX

Replacement of SPT bridge no-2  ch-3.00 km by RCC bridge on Nadiapurbazar- Old NEC road via Saidacherra.

432.80

389.52

43.280

Work in progress.

43

XX

Replacement of Bailey by RCC bridge over Ratacherra on MDF road  in between Kanchanbari to Chowmuhani Bazar.

486.90

438.21

48.690

Substructure work in progress.

44

XX

Replacement of Bailey by RCC bridge overJuraicherra on MDF road  in between Fatikroy to Chowmuhani Bazar.

486.90

438.21

48.690

Piling and abutment completed. Work in progress.

45

XXI

Replacement of Bailey bridge by RCC Bridge on the road from Dasda Bazar to Adibasighat at ch. 1.20 km over Deo river

973.80

876.42

97.38

Proposed for cancellation of 6th call of tender due to high rate.

46

XXI

Construction RCC bridge over local cherra on the road from Chittamara to Joyharipara (L032) (Span 2x25.00 Mtr.) at Ch. 0.475 km

541.00

486.90

54.10

Piling work in progress.

47

XXI

Constn. of RCC Bridge (Span = 25.00 mtr) over local cherra near Hrishyamukh Block Office on the road from Belonia - Nalua Road to Hrishyamukh Block

270.50

243.45

27.05

Tender cancelled due to high rate.

48

XXI

Constn. of RCC bridge over local cherra on the road from Mandarai to Jasmura (Span = 35.00 mtr)

378.70

340.83

37.87

Staging of deck slab in progress.

49

XXI

Replacement of Bailey Bridge by RCC Bridge over bet cherra on the road from Chellagang to Karbook  at Chaitraham para ch. 0.50 km

541.00

486.90

54.10

Pile work in progress.

50

XXI

Construction of RCC Bridge over Sankuma Cherra at ch. 2.00 km over Jampuijala bazar to Sambaria Bazar via Natunnagar

432.80

389.52

43.28

Substructure complete. Staging work of super structure in progress

51

XXI

Improvement of Gandacherra - Raishyabari road (L = 32.00 Km)/ Sh:- Widening, strengthening, retaining wall, toe wall, CDs etc. portion from 0.00 km to 28.50 km.

1938.00

1744.20

193.80

Work in progress. 

52

XXII

Improvement of Bagbassa – Dharmanagar road from intermediate lane to double lane/SH: Widening, BM, Carpeting, protection wall etc. Portion from Ch. -0.00 km to 8.00 km

915.470

823.920

91.550

90% completed. Work in progress.

53

XXII

Improvement of road from Nutanbazar to Gobindapur road via Pretyekroy H.S. School road (L-4.00 km)/ SH: Patch soling, widening, metaling, carpeting,  including construction of toe walls.

185.200

166.680

18.520

In progress.

54

XXII

Improvement of Manu - Kanchanpur road (L = 35.00 Km)/ Sh:- Formation in widening, metalling, carpeting in/c protection wall and drainage work.

2721.270

2449.140

272.130

Target-27.70km  Achieved                  GSB-25.50 Km, WBMII-24.00 Km, WBMIII-20.00 Km and             BM&PMC- 17.00 Km 

55

XXII

Improvement of road from Old Mandai to Madhabpara (L = 12.50 Km)/ Sh:- Construction of retaining wall and road side pucca drain including metalling, carpeting, sand seal coat etc. portion from 1.00 km to 12.50 km

366.600

329.940

36.660

80% completed.

56

XXII

Improvement of road from Kathalia Microsapara road (at Ledrabari) to Manaipathar (L = 7.50 km)/ Sh:- Widening, formation, GSB, WBM, BM, PMC with seal coat, CD, protection wall and road side drain under Kathalia Block (TSP area)

720.000

648.000

72.000

BM & PMC completed for 6.00 km. Balance 100 mtr. PMC in CD approach in progress.

57

XXII

Improvement of road from Kalacherra to Manirambari via Gardhang (L = 9.50 Km)

380.000

342.000

38.000

Carpetting 7.20 km completed.

58

XXII

Improvement of road from Bagafa to Gobindabari (L – 9.50 Km)/ Sh:- Widening of road, re-grading, soling, retaining wall, toe wall, metalling, carpeting and road side pucca drain etc. ch. 4.00 km to 9.50 Km

314.930

283.440

31.490

Work in progress. 3 km completed.

59

XXII

Imp. of road from Bagafa to Akama (L= 12.00 km)/ Sh:- Widening of road, re-grading, soling, retaining wall, toe wall, metalling, carpeting and road side pucca drain etc. ch. 0.00 km to 10.50 km

605.480

544.930

60.550

DNIeT for balance work issued.

60

XXII

Improvement of road from NH-44 (Jolaibari) to Ailmara via Kowaifung (L = 21.25 Km)

1083.990

975.590

108.400

In progress.

61

XXII

Improvement of road from TNV Colony (Aloy Cherra Market, NH44) to B.B. road via Khas Tilla & NBCC Road (L094) (L= 7.80 Km)/ Sh:- Widening of road by brick soling, metalling, carpeting, side shouldering, retaining wall, toe wall, construction on 1(one) no box cell culvert & 3 nos slab culvert and road side drain.

435.000

391.500

43.500

Work in progress.

62

XXIII

Replacement of existing Bailey Bridge at Khasiapunji on K-A Road to Ashapurna Roaja Para by construction of Box Cell during the year 2016-17/ SH :- Construction of 1 (One) no. Box-cell (3 x 8.00 mtr) .

125.36

112.82

12.54

Work in progress.

63

XXIII

Replacement of existing damaged slab culvert on K-A Road ( in front of Salema Town Hall) at Ch. 24.85 Km. by providing RCC box cell during the year 2017-18/S.H: Construition Box Cell (2 x 6.00 Mtr.)

93.40

84.06

9.34

Box slab completed and approach road work in progress.

64

XXIII

Replacement of bailey bridge by RCC bridge on the road from Kanchanpur to Dasda at ch. 3.00  km

541.00

486.90

54.10

4th call of tender invited.

65

XXIII

Replacement of bailey bridge by RCC bridge on the road from Damcherra to Jalabassa over Piplacherra.

162.30

146.07

16.23

Work order issued.

66

XXIII

Replacement of bailey bridge by RCC bridge over Waimbookcherra  on the road from Damcherra to Khedacherra.

162.30

146.07

16.23

Work order issued.

67

XXIII

Construction of RCC bridge over Manu at Chaintail ferryghat on Paiturbazar - Sunamara road (Ch. 2.35 km).

1731.20

1558.08

173.12

Work in progress.

68

XXIII

Replacement of Bailey bridge by RCC bridge over Halaicherra on Kailashahar Golakpur- N.C. Para road (Ch:- 6.90 km)

411.16

370.04

41.12

Tendering stage.

69

XXIII

Replacement of Cable Suspension bridge By RCC Steel Truss Bridge over River Manu at Jalai Village near Jalai Bazar.

1514.80

1363.32

151.48

DNIeT issued.

70

XXIII

Replacement of SPT bridge by RCC / Steel Girder bridge over river Gomati at Mailak from Amarpur-Mailak road at ch 0.30 km.

995.44

895.90

99.54

Pile work in progress.

71

XXIII

Replacement of Bailey Bridge by RCC Bridge over Muhuri river on the road from Kowaifung to Panjirai at Ch-2.225 kM.

541.00

486.90

54.10

Test pile could not be started due to railfall which is to be started shortly.

72

XXIII

Replacement of bailey bridge by RCC bridge over Baiboon Cherra on Bankumari to manikpur road at ch. 6.20 km

324.60

292.14

32.46

Piling work in progress.

73

XXIII

Construction of RCC Bridge over Raima river on Gandacherra-Raishyabari road (ch. 19.320 km) under PWD (R&B) Gandacherra Sub-Division.

541.00

486.90

54.10

8th call of tender invited.

74

XXIII

Up-gradation of Machmara to Krishnatilla Road (Total Length=7.00 Km).

741.09

666.98

74.11

Work in progress.

75

XXIII

Improvement of road from A.A. road near Tuichindra bazar to to Hrankhal Bazar (Ch. 0.00 km to 2.50 km) / SH: Widening, metalling, carpeting, retaining wall, CD etc.

381.48

343.33

38.15

Work in progress.

76

XXIII

Imp of road from T.K. road  from Baramaidan to Porkhalong (L=11.00 km) via Worento bari to Hazaribari under Padmabil Block /SH: Re- Carpeting, WBM-II,Tack Coat carpeting, Seal Coat, Surface drain ,Soling, CD.

845.97

761.37

84.60

In progress.

77

XXIII

Improvement of  road  from Tuidu-Lungfung via Palku ( L=10.50 Km)/ SH: Brick Soling, WBM, Carpeting, Sand seal coat, CD etc.

568.00

511.20

56.80

Work in progress.

78

XXIII

Improvement of road from Jolaibari to Hrishyamukh upto Ramraibari (L=16.96 km)/ widening, regrading, C.D. , Side drain, Toe wall , etc. ch. 0.00 Km to 16.96 km.

2990.26

2691.23

299.03

Work in progress.

79

XXIII

Improvement of road from Satmura Chowmuhani to Belonia Railway Station (L-2.40 km) / SH: Widening, Flat & edge Soling, Metalling, Carpeting, Construction of C.D., Toe wall, Road side pucca drain & other allied works.

311.74

280.57

31.17

Work in progress.

80

XXIII

Improvement and widening (both side) of road from Kashari Trijunction to Gourangabazar to make it intermediate width (total length - 30.00 km)/ Sh:- Flat brick soling, edge soling, metalling, carpeting, seal coat, protection wall and other allied works etc.

1839.00

1655.10

183.90

Work in progress.

81

XXIII

Imp. of road from NH08 (Karaiban) to Tolakona via Noagaon Keprampara Landless Colony (L = 5.00 km)

546.41

491.77

54.64

90% completed.

82

XXIII

Improvement and Upgradation of Kamalpur to Manikbhander Road to Double lane//SH: Widening, BM, Carpeting, CD etc. Portion from Ch. -0.00 km to 5.00 km.

1564.86

1408.37

156.49

2nd call of tender invited.

83

XXIV

Replacement of SPT bridge by Steel bailey bridge over river Sonai on the road from Mohanpur to Simna near Mohanpur Market at ch. 0.80 km

369.00

332.100

36.900

19.73% work done for abutment and in progress. And supply order is given for bailey bridge materials and yet to be received.

84

XXIV

Replacement  of  baiiley bridge by RCC  Box culvert (Span  =3x 6.00  mtr  Height 4.00 m ) over Ragnacherra  near Ragna LCS  during the year 2017-18.

77.00

69.300

7.700

Work not started

85

XXIV

Construction of  RCC  Box culvert (Span  =3x 6.00  mtr  Height 5.00 m ) over local  cherra  on Bhagyapur PWD road to  NH 208 A near Sonarbassa   during the year 2017-18.

88.00

79.200

8.800

Work in progress.

86

XXIV

Replacement of bailey bridge by Triple Box Cell Culvert at North Waimbukcherra on Damcherra to Khedacherra road(3 x7.00 x 7.00 mtrs) (At ch. 44.10 km).

165.00

148.500

16.500

Reinforcement work of top slab is in progress.

87

XXIV

Construction of R.C.C box cell culvert  (L=3X4.00m=12.00m, height-3.00m) over local cherra on the road from Baijalbari to Donbosco school under padmabil block ( TSP)

62.70

56.430

6.270

Top slab completed.

88

XXIV

Construction of R.C.C box cell culvert  (L=3X8.00m=24.00m, height-5.60m) over Ichalicherra on the road from Ratanpur bazaar tilla to Padmabil  under padmabil block  ( TSP)

123.00

110.700

12.300

Work in progress.

89

XXIV

Construction of R.C.C box cell culvert  (L=3X6.00m=18.00m, height-5.00m) over sonaraicherra on the road from Iswarsardar para to Dulalia bari under padmabil block  ( TSP)

102.30

92.070

10.230

Top slab completed.

90

XXIV

Replacement of bailey bridge by construction of RCC box cell (2x8.00m) on the road from Korbong to Radha Charan para at Ch: 0.60Km. under Belbari block. 

85.93

77.337

8.593

Tendering stage.

91

XXIV

RCC Boxcell 2 x 6.00 Mtr at Radhanagar over local Cherra Road from Kalinjoy to Battala under Hezamara R.D. Block.

72.23

65.007

7.223

In progress

92

XXIV

Construction of  RCC Box-cell   at Ch. 2.60 Km over local cherra on K-M-A road to Kachucherra Police Station via Kakariatila  / SH :-1(one) no RCC Box Cell (3x8.00) mtr.

141.50

127.350

14.150

In progress

93

XXIV

Construction of RCC Box culvert ( Length = 2 x 8.00 m = 16.00 m, Height =7m, Carriageway width 7.5 m without footpath) over Localcherra on the road from Lalcherra to Gejacherra via Twichak Twisa High School under Manu R.D. Block during the year 2018-19/ SH: Earth work, P.C.C Work, R.C.C. work, C.C. blockpitching, Brick work, soling etc.

84.00

75.600

8.400

Top slab casting completed now approach in progress

94

XXIV

Construction of RCC Box-Cell Culvert ( 3x6.00mtr) over Local Cherra on the road from Karbook-Silachari road (Nabajoy Para) to Chellagang  at Ch. 10.00km 

118.80

106.920

11.880

Work in progress.

95

XXIV

Construction of RCC Box-Cell Culvert ( 3x8.00mtr) over Local Cherra on the road from Karbook-Silachari road (Nabajoy Para) to Chellagang  at Ch. 10.80km 

137.50

123.750

13.750

Work in progress.

96

XXIV

Construction of RCC Box-Cell Culvert ( 2x6.00mtr) over Local Cherra on the road from Karbook-Silachari road (Nabajoy Para) to Chellagang  at Ch. 0.70km 

79.20

71.280

7.920

In progress

97

XXIV

Construction of RCC boxcell of span (3x5.00m) and 5.00m clear height and carriage width 6.00m on the road from NH-08(Harina)to Babugram at ch 1.70km on Rupaicherra.

88.00

79.200

8.800

In progress

98

XXIV

Construction of four cell RCC Box structure 5.5 m x 7.80 m (with earth cushion) over local cherra across the approach road towards Santirbazar end of the RCC Bridge over river Muhuri from Shillong Mog Para - Bhagyamani Chakma Para (PMGSY road) to Betaga via Lowgang at ch. 1.70 km

195.71

176.139

19.571

In progress

99

XXIV

Replacement of bailey bridge by construction of RCC Box culvert (3m x 8m) at Madhyapara on the road from  Belonia-UBC Nagar road to UBC nagar-Barpathari road during the year 2018-19.

137.50

123.750

13.750

Work to be sarted

100

XXIV

Replacement of bailey bridge by construction of RCC Box culvert (3m x 8m) at Muzaffar para on the road from Bishnupur AWC to Bagachetal bazar during the year 2018-19.

137.50

123.750

13.750

In progress

101

XXIV

Replacement of Bailey Bridge on the road from Anandanagar to Muchrai Para via 9 no. Para ch. Km 0.80

60.54

54.486

6.054

Top slab casting in progress.

102

XXIV

Strengthening of PWD Bituminus road from Tulasikhar Block to Tulasikhar Bazar under Tulasikhar Block ( L= 7.00km)/ SH: WBM-II, WBM-III and re-carpeting work

308.00

277.200

30.800

Work in progress.

103

XXIV

Strengthening of PWD Bituminus road from  Dhalabil to Ramchandra Ghat under Khowai Block ( L= 6.50km)/ SH: WBM-II, WBM-III and re-carpeting work

357.50

321.750

35.750

5km completed. Work in progress.

104

XXIV

Strengthening of road from Dalak to Gamako via Paschim Malbassa/ SH;- Re-carpeting, sand seal coat.

101.20

91.080

10.120

2 km completed. Work in progress.

105

XXIV

Strengthening of road from Agartala - Udaipur (Police Line) road to Khupilong / SH:- Re-carpeting & seal coat.

126.50

113.850

12.650

Re-carpetting wotk done upto 95%. Pucca drain work pending.

106

XXIV

Strengthening of road from Ratanpur to Monirambari via Shibpur ADCV Village under Hrishyamukh RD Block/ Sh:- Patch repairing and re-carpeting.etc.

151.80

136.620

15.180

In progress.

107

XXIV

Strengthening of roadf from Belonia - Rajnagar road near Sonapur Girls School to Monaipathar via Hetalia under Rajnagar RD Block/ Sh:- Patch repairing and re-carpeting etc.

101.20

91.080

10.120

In progress.

108

XXIV

Strengthening of road from Gandacherra to Amarpur ch. 0.00 km to ch. 17.50 km/ re-carpeting, metalling and seal coating.

339.38

305.442

33.938

Work started.

109

XXIV

Improvement of road from Jalefa Petrol Pump to Sabroom Railway Station

324.50

292.050

32.450

1.50km WBM3 completed.

110

XXIV

Strengthening of road D.A. Road to NH-08 via Baraithal/ SH:- re-carpeting, grouting, portion from ch. 1.50 km to ch. 4.00 km

38.78

34.902

3.878

2.10 km completd. Work in progress

111

XXIV

Strengthening of road from 82 mile to Bhati Dhudhpur road during the year 2018-19/ SH;- Carpeting, grouting etc.

89.85

80.865

8.985

In progress.

112

XXIV

Strengthening of Kailashahar - Fatikroy road/ Patch metalling, grouting, re-carpeting, seal coating including CD and road side pucca drain ch. 0.00 to 7.10 km

100.30

90.270

10.030

5.70km PMC complete.In progress

113

XXIV

Improvement of road from Golaghati - Nabasantiganj Bazar to Birchandrapara under Jampaijala R D Block (L = 3.60 km) during the year 2018-19/ SH:- Formation, GSB, WBM-2 & 3, carpeting, sand seal coating.

333.06

299.754

33.306

Work almost complete.

114

XXIV

Improvement of road from Khowai to Radhanagar via Sankhola Industry (L = 10.00 km)/ Patch soling, metalling, carpeting, side drain, CD etc./ Portion from ch. 0.00 km to 6.00 km starting from Radhanagar

460.00

414.000

46.000

3rd call of tender invited.

115

XXIV

Strengthening of road from Santi Para to Berimura (L = 4.87 km) during the year 2018-19/ SH:-patch soling, patch metalling, re-carpeting, grouting in/c side drain etc.

85.00

76.500

8.500

In progress

116

XXIV

Strengthening of road from Sarkar Tilla Champamura (L 4.00 km) during the year 2018-19/ SH:- re-sectioning, carpeting, sand seal coating & CD.

110.00

99.000

11.000

CD completed, Recarpetting for 3.50 km completed, balance recarpetting will be completed soon.

117

XXIV

Strengthening and widening road from Bye Pass (near Railway Station over Bridge) TO 400 kv Sub-Station at Surjyamaninagar via Kathaltali G.P. Madhuban G.P. At Dukli Industrial Block to Ranirkhamar (L = 5.00 km)/ Sh:- GSB, metalling and carpeting etc.

423.36

381.024

42.336

Tendering stage.

118

XXIV

Strengtheing of road from Mayarani to Kalirbazar via Rabigopal School (L = 3.50 km) and road from Kunaban Chowmuhani to Durlavnarayan (L = 2.00 km) during the year 2018-19/ SH:- Widening, GSB, WBM, carpeting, CD, toe wall, pucca drain etc.

152.09

136.881

15.209

Work completed except CD drain etc.

119

XXIV

Strengthening of road from Durlavnarayan to Kalirbazar via Kash Chowmuhani (L = 6.10 km) during the year 2018-19/ SH:- Widening, GSB, WBM,carpeting, CD, toe wall, pucca drain etc.

168.30

151.470

16.830

Work completed upto 6.00km. Balance in progress.

120

XXIV

Construction of roa from Ghoshpara to Barmura Panchayet Office via Ghoshpara School under Paharmura Panchayet

148.50

133.650

14.850

Work order issued. Land problem. Land demarcation initiated.

121

XXV

Up-gradation of road from Rajkumar para to Dhaniram para (L = 3.50 km) under Mungiakami Block/ Sh:- Metalling, carpeting, box culvert, pucca drain and protection work etc.

253.65

228.285

25.365

Tendering stage.

122

XXV

Improvement of road from NH-08 (ch. 381 km) to Sikaribari tower/ Re-carpeting, metalling and seal coating, retaining wall, traffic signages etc.

133.90

120.510

13.39

Tendering stage.

123

XXV

Improvement of road from Chailengta Buddha Mandir to NH-44(A) Lalcherra road (L = 0.75 km)/ SH:- Metalling, carpeting, road side drain and toe wall etc.

91.03

81.927

9.103

Toe wall & Drain in progress

124

XXV

Improvement of road from  Karamcherra market (at NH44) to Ramani Reang Para (L= 3.00 km)/ SH:- Metalling, carpeting, road side drain and retaining wall wall etc. Portion from  1.00 km to 3.00 km.

162.07

145.863

16.207

WBM-0.05km done and work in progress

125

XXV

Improvement and upgradation of Lamboo-Garden road to Mayacherri of length 4.625 km/ SH;- Widening, carpeting, CD etc.

421.60

379.440

42.16

2nd call of tender under scritiny

126

XXV

Improvement of road from Gandhi Home (near Golaghati) to Jampaijala via Takarjala (L = 16.00 km) / Portion from Golaghati Bazar to Jamuijala/ SH:-GSB, Metalling, carpeting, sand seal coat, road side drain and retaining wall wall etc.

2095.66

1886.094

209.566

Work in progress.

127

XXV

Upgradation of of road from Shillong Mog Para to Lowgang Bazar (L = 1.648 km) and Lowgang Bazar (Ganga Mandir) to Gardhang via Chaigharia School and Das Para (L = 3.176 km)/ Sh:- Soling, metalling, carpeting, protection wall and road side pucca drain etc. (Total length 4.824 km).

328.29

295.461

32.829

Work in progress.

128

XXV

Improvement of road from TTAADC H/Q to Jampaijala SDM Office via Gurupada Colony and Firm Chowmuhani (L = 10.90 km) under Belbari RD Block/ SH:- Widening by GSB, metalling, carpeting & construction of retaining wall, toe wall & CD etc.

815.67

734.103

81.567

2nd call of tender invited.

129

XXV

Improvement of road from NH-44 (now NH-08) (Champak Nagar) to TTAADC H/Q via Balaram Thakur Para and Bikram Molsom (L = 14.00 km) under Belbari R D Block/ SH:- Widening by GSB, metalling, carpeting, sand seal coating & construction of retaining wall, toe wall & CD etc.

1185.82

1067.238

118.582

2nd call of tender invited.

130

XXV

Improvement of road from Agt - Simna road at ch. 33.00 km to Khowai Chowmuhani via Hezamara (L = 5.50 km)/ SH:- Patch soling, metalling, carpeting, side drain including 2 nos CD etc. Portion from Ch. 1.70 km to 3.60 km (Haticherra to Barshanpara).

189.10

170.190

18.91

Work in progress

131

XXV

Improvement of road from Lembucherra to Kalkalia via Noagaon-Bazalghat / SH:- Patch soling, metalling, carpeting, side drain in/c 2 nos CD  portion from Noagaon up to Bamutia-Fatikcherra road (L = 2.15 km)

137.08

123.372

13.708

Work in progress

 

 

 