Projects

Administrative Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostSchemeYear of SanctionedTotal Fund ReleasedTarget date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
SOUTH DISTRICT:-
1 Santirbazar Division Proposed Construction of Community Hall at Birchandra Manu Sahid Smriti Complex at Birchandra Manu, Santirbazar, South Tripura under MPLADS (Rajya Sabha)/SH: Construction of Lower Ground Floor only (Phase-I) /Building portion including internal water supply and sanitary installation. 173.00 MPLADS (Rajya Sabha) 2015-16 ---- ----  Foundation work started.
NORTH DISTRICT
1 Dharmanagar Division Extension of Circuit House at Dharmanagar, North Tripura during the year 2013-2014." 759.05 --- 2014-15 --- Jan, 2018. Foundation work is in progress.
DHALAI DISTRICT
1 Ambassa Division Construction of New Forest Rest House adjacent to Ambassa – Kamalpur Road under Ambassa Forest Division, Ambassa, Dhalai, Tripura/SH: Building portion including internal water supply and sanitary installation. 519.08 State Plan 2012-13 264.00 Completed Work Completed
KHOWAI DISTRICT
1 Khowai Division Proposed construction of Circuit House (G+2) storied at Khowai. 530.00 --- 2016-17 --- --- Preliminary estimate amount to Rs.530.00 lakhs sent to the concerned deptt. for according A/A & E/S on 03-06-2016.

Animal Resource Development Department (ARDD)

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 Jirania Division College of Veterinary Sciences and Animal Husbandry at R.K.Nagar, West Tripura /SH. Construction of 2(Two) Nos Hostel Building for Boys & Girls (1st Phase- G+1)/Building Portion including internal water supply and sanitary installation. 827.05 ARDD 2012-13 250.00 August, 2016 Building part completed. Boundary wall in progress.
2 College of Veterinary Sciences and Animal Husbandry at R.K.Nagar, West Tripura [3rd Phase]/SH. Vertical Extension of Academic Block (Remaining portion-3rd & part of 4th floor). 710.00 ARDD 2015-16 --- ---- Preliminary estimate sent to concerned Deptt. for A/A & E/S.

Border Area Development Programme (BADP)

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
DHALAI DISTRICT
1 Ambassa Division (i) Road from Ratan Nagar Market to IBB Road via S K Para BOP under Gandacherra Sub-division (L=6.00 KM).
(ii) Road from Ratan Nagar Market to IBB Road via S K Para BOP under Gandacherra Sub-division (L=4.00 KM).
1097.00 BRDP ---- 1097.00 March, 2016. Formation =10.56 km, GSB=8.56 km, Retaining wall=279.10 Mtr, CD=13 nos completed.
Target date of completion: March'16
2 Additional link Road from Boalkhali to Maharaja-I (L=7.35 km) 810.00 BRDP ---- 810.00 March, 2016.

Formation =7.35 km, GSB=5.00 km, Metalling=4.50 km, Retaining wall=88.00 Mtr, Box Cell=2 No completed.

Target date of completion: March-16

Clinical Research Finance-Sponsored Projects Administration(CRF-SPA )

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 --- Improvement and upgradation of road from Chandrapur to Chaturdash Devta Temple via Baldakhal(L=3.831 km) 646.50 --- --- --- --- Work yet to be started.
GOMOTI DISTRICT
1 Amarpur Division Improvement of road leading to newly constructed Sub divisional H.Q. Karbok/ portion from Amarpur to Karbook/ Silachari (l=25.50 km) (beyond the protion upgrade from (PMGSY) under SPA-tide 2415.00 -- -- -- March, 2016. Work completed for 18 km. Work in progress for balance work.

Centrally Sponsored Scheme(CSS)

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 Agartala Division No-I, Agartala Construction of RCC covered drain from ICP main gate upto Zero Point at Indo-Bangladesh Border over Akhaura Khal (L=130.00 mtr.) 200.89 CSS ---- ---- March, 2017. Tender just received
2 Imp. upgradation of the approach road from Fire Bridge Chowmuhani to Agartala Land Custom station by providing RCC covered drain/covering of existing drain to the RCC Box cell along Akhaura road. 387.43 CSS ---- 500.00 March, 2017. Foundation work of drain in progress. Formation work is in progress.10% completed.
3 Development of road in front of ICP, Agartala upto Zero Point at Indo-Bangladesh Border at Akhaura (L=324.85 mtr) 144.31 CSS ---- --- March, 2017. Tender invited

Economic & Importance (E & I PROJECT)

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
SOUTH DISTRICT
1 --- Improvement of road from NH-44 junction at Udaipur (District Head Quarter) to Amarpur Sub-divisional Head Quarter (24.96 km)/ Portion from Maharai to Amarpur, Length- 16.080 km (Ch: 8.80 km to 24.960 km) (Job No.-EI-TR-2011-12-03) 2122.26 E & I Project. --- ---- ---- Road work completed
Bridge: completed
CD: completed
R/W: 153.00 M
Road side drain: 8682 M.
Maintenance work for the defect portion has been completed by the agency(M/s GPT Infrastructure Pvt. Ltd.). 

 

Fire Service Department

 

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
DHALAI DISTRICT
1 Kamalpur Division Construction of Permanent building for Kamalpur Fire Station, Kamalpur, Dhalai, Tripura /SH: Building portion including internal water supply and sanitary installations. 152.18 State Plan 2014-15 50.00 Completed Completed and ready for handed over.
Inauguration date fixed on 23-05-2016.
2 Ambassa Division Construction of Ambassa Fire Service Station, Dhalai, Tripura/SH: Building portion including internal water supply and sanitary installations. 134.84 State Plan 2014-15 --- ---

Work order issued. 

Work site handed over to the agency alongwith architectural / structural drawing but agency could not start the work till date.

3 Proposed permanent functional building for Raishyabari Fire Station at Dhalai District, Tripura. 176.97 State Plan 2015-16 --- --- Detailed Preliminary Estimate processed for according A/A & E/S.
SEPAHIJALA DISTRICT
1 Sonamura Division Construction of Permanent functional building of Kathalia Fire Station under Sonamura Sub-division /SH: Building portion including internal water supply and sanitary installations. 169.16 NEC 2013-14 ---- Completed Work completed and handed over.
2 Permanent functional building for Melaghar Fire Station at Melaghar, Sonamura, Sepahijala District, Tripura. 102.53 SCA (un-tied) 2014-15 --- Dec., 2016. Work at finishing stage.
3 Proposed construction of 6 nos. Type-II staff quarters including boundary wall at Kathalia Fire Service station. 145.00 State Plan 2015-16. ---- --- Preliminary estimate processed to concerned Deptt. for A/A & E/S.
4 Bishramganj Division Construction of Permanent functional building of Bishramganj Fire Station, Bishramganj, Sepahijala District, Tripura /SH: Building portion including internal water supply and sanitary installations. 153.90 Deposit 2014-15 142.94 August, 2016 Work at finishing stage.
WEST DISTRICT
1 Mohanpur Division Proposed Permanent Functional Building for Mohanpur Fire Station/SH: Building portion including an under ground Tank, internal water supply and sanitary installation. 154.26 State Plan 2014-15 --- Jan., 2017 Work is in progress.
SOUTH DISTRICT
1 Belonia Division Construction of Permanent functional building of Belonia Fire Station, Belonia, South Tripura /SH: Building portion including internal water supply and sanitary installations. 155.37 --- 2015-16 --- --- Site plan will be forwarded very shortly.
2 Proposed permanent functional building for Hrishyamukh Fire Station at Belonia, South Tripura District. 176.97 --- 2015-16 --- --- Detailed Preliminary Estimate processed for according A/A & E/S.
3 Sabroom Division Proposed permanent functional building for Manubazar Fire Station at Sabroom, South Tripura District. 176.97 --- 2015-16 --- --- Detailed Preliminary Estimate processed for according A/A & E/S.
NORTH DISTRICT
1 Kanchanpur Division Construction of Permanent functional building of Kanchanpur Fire Station, Kanchanpur, North Tripura /SH: Building portion including internal water supply and sanitary installations. 152.02 State Plan 2013-14 199.58 Completed Completed & Handed Over.
2 Fire Station Station at Damcherra. ---   2016-17 --- --- Architectural drawing is under preparation.
3 Fire Station Station at Jampui Hill. ---   2016-17 --- -- Architectural drawing is under preparation.
UNOKOTI DISTRICT
1 Kumarghat Division Fire Station Station at Petcharthal. ---   2016-17 --- --- Architectural drawing is under preparation.

Food & Consumer Affairs Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 Jirania Division Construction of 2(two) nos. 5000 MT capacity Food Godown internal road at Inter State Truck Terminus, Madhavbari, Jirania, West. 1007.00 CSS 2012-13 1008.00 August, 2016. Work completed.
2 Agartala Division No-V, Agartala Construction of double storied Office Building at Central Stores (Food, Civil Supplies & Consumer Affairs Deptt.) at A.D. Nagar, West Tripura/SH: Building portion including internal water supply and sanitary installation. 224.51 NLCPR 2014-15 25.00 March, 2017. Upto 1st floor completed.
3 Agartala Division No-III, Agartala Proposed Vertical extension at 4th floor of Khadya-O-Bhokta Bhavan at Gurkhabasti, Agartala, Tripura excluding lift for permanent accommodation of State Consumer Disputes Redressal Commission (State Commission) & West Tripura, District Consumer Disputes Redressal Forum /SH: Building portion including internal water supply and sanitary installation. 479.00 "Strenthing of Consumer Forum" 2015-16 --- July, 2017. Work order issued.
NORTH DISTRICT
1 Dharmanagar Division Construction of double storied Office Building for Dy. Director of Food at Dharmanagar, North Tripura /SH: Building portion including internal water supply and sanitary installation. 224.51 State Plan 2014-15 40.00 Sept, 2016 Work below roof level completed. Centering, Shuttering of roof slab in progress..
GOMOTI DISTRICT
1 Amarpur Division Constn. of 1000 MT capacity go-down at Jatanbari (Now at Karbook) 96.00 CSS 2013-14 73.66 Completed

Main go-down completed and handed over / innaugarated.

Boundary wall will be started after obtaining necessary sanction.

Fisharies Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
NORTH DISTRICT
1 Dharmanagar Division Construction of Fish Farmers Training Centre (G+2) with accommodation facilities for faculty members at Superintendent of Fisheries Office Complex, Dharmanagar, North Tripura/SH: Building portion including internal water supply and sanitary installations. 263.61 --- 2015-16 --- --- Preliminary cost estimate issued for according A/A & E/S.

Handloom Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 Agartala Division No-III, Agartala Proposed construction of Godown, Office & Dormitory (Second Phase Development) at THHDC Complex, Purbasha, Agartala, West Tripura.. 1048.00 -- 2015-16 --- --- Preliminary cost estimate issued for according A/A & E/S.

Health Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
Primary Health Centres
NORTH DISTRICT :-
1 Kanchanpur Divison Construction of 10 bedded PHC (single storey) at Gachirampara, Kanchanpur, North Tripura including quarters. 630.00 RIDF 2012-13 586.00 August, 2016. Work Completed 
2 Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Laljuiri PHC, Kanchanpur, North Tripura under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 IMR(13th FC) 2012-13 100.00 December, 2017.

Foundation work in progress.

3 Construction of Kanchanpur Sub-Divisional Hospital, North Tripura. 1924.34 ACA/SPA 2012-13 1356.97 August, 2016. Finishing work in progress.
4 Dharmanagar Division Construction of 20 bedded PHC at Tilthai under Dharmanagar Sub-Division, North Tripura. 405.00 NHM 2015-16 --- ---

A/A & E/S accorded. 

Tender called.

5 Construction of 10 bedded PHC with quarters at Rajnagar under Juvarajnagar, Block, Dharmanagar Sub-Division, North District. --- NHM 2016-17 --- --- Tender Called
6 Up-gradation of Panisagar CHC to 50 bedded Sub-Divisional Hospital including staff quarters. 1517.00 ---- 2014-15 --- --- DPR processed to concerned Deptt.in Jan.2016 for according A/A & E/S.
7 Proposed construction of 12(Twelve) nos. Staff quarters {Type-III -6 nos and Type-IV - 6 nos) } at Dharmangar Sub-Divisional Hospital Complex. 447.73 IMR -
13th FC
2015-16 --- --- Tender Accepted. 
8 Construction of 12 Nos. staff quarters for Sub-Divisional Hospital at Dharmanagar [ Type-III = 06 nos. &  Type-IV = 06 nos. ] 344.00 --- 2016-17 --- ---

DPR sent to Health Deptt. on 31-08-2016 for according A/A & E/S.

However, tender accepted and work order issued.

UNAKOTI DISTRICT :-
1 Kailashahar Division Construction of Primary Health Centre at Bhaterbazar including Quarter. 630.00 NHM 2012-13 477.50 Completed Work completed and handed over.
2 Construction of 10 bedded PHC at Muraibari, Kailashahar, North Tripura including quarters. 630.00 NHM 2012-13 535.00 Completed Work completed and Hundred Over.
3 Construction of New 10 nos. staff quarters (Type-I-4, Type-II-4 & Type-III-2) at Irani under Gournagar block, Kailashahar Sub-Division, Unakoti District, Tripura. 225.00 IMR -
13th FC
2015-16 --- Oct,2017.  Work in progress. 
4 Proposed construction of District Training Centre at Kailashahar, Unakoti District, Tripura. 597.40 IMR 2015-16 --- --- Tender accepted.
5 Infrastructure Development of North District Hospital at Kailashahar, North Tripura/ Construction of Staff Quarters & Development of Site including Internal Roads. Total 40 (Forty) Quarters [Type-IV-6 Nos., Type-III-12 Nos., Type-II-10 Nos. & Type-I-12 Nos./SH: Construction of Type - IV quarter 1(one) Block [Twin three storied, 6(six) units], Type - III quarter 2(two) Block [Twin three storied, 12(twelve) units] , Type - II quarter 1(one) Block [Twin three storied, 6(six) units], Type - II quarter 1(one) Block [Twin double storied, 4(four) units] & Type - I quarter 2(two) Block [Twin three storied, 12(twelve) units]/Building portion including internal water supply and sanitary installations. 815.97 State Plan(NABARD) 2010-11 728.36 Completed Work completed and handed over.
6 Kumarghat Division Construction of 10 bedded PHC at Rajkandi, Kumarghat, North Tripura including quarters. 630.00 NHM 2012-13 427.5

Oct,2016.

Finishing work in progress. 

7 Construction of 10 bedded PHC at Santipur, Kumarghat Sub-Division, Kumarghat Block, Unakoti District, Tripura. 540.00 RIDF-XX 2014-15 --- ---- Tender Called.
8 Up-gradation of Kumarghat CHC to 50 bedded Sub-Divisional Hospital. 2047.00 RDF 2015-16 --- --- e-Tender received and under evaluation.
9 Construction of 10 bedded PHC at including 10 Nos. quarters at Krishnatilla, Pecharthal Block, Unakoti District, Tripura. 540.00 SPA 2014-15 230.00 August, 2017 PHC building work in progress.
DHALAI DISTRICT :-
1 L.T. Valley Divison Construction of Primary Health Centre at Lalchara including Quarter. 630.00 NHM 2012-13 427.50 Completed Work completed and handed over, approach road is in progress. Boundary wall essential
2 Construction of Primary Health Centre at Masli including Quarter. 630.00 NHM 2012-13. 482.80 Sept, 2016 Flooring, sanitary, water supply, door window, grill and painting works remains to be done progress.
3 Proposed construction of Type-I quarter (Twin double storeyed-4 units), Type-II quarter (twin double storeyed-4 units), Type-III quarter (Twin single storeyed-2 units) at Manikpur PHC, Chawmanu Block, Dhalai, Tripura under State Plan (NABARD) during the year 2011-12/SH: Building portion including internal water supply and sanitary installation. 189.41 NHM --- 178.89 Oct, 2016

Finishing work in progress.

4 Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at 23-KM PHC, L.T. Valley, Dhalai Tripura under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 RIDF-XVIII 2012-13 -- --- 3rd call of tender is in progress.
5 Ambassa Divison Proposed construction of District Training Centre at Kulai, Dhalai District, Tripura. 597.40 IMR 2015-16 --- --- Tender Accepted.
6 Infrastructure Development of Dhalai District Hospital at Kulai, Ambassa, Dhalai, Tripura/ Construction of Staff Quarters & Development of Site including Internal Roads. Total 40 (Forty) Quarters [Type-IV-6 Nos., Type-III-12 Nos., Type-II-10 Nos. & Type-I-12 Nos./SH: Construction of Type - IV quarter 1(one) Block [Twin three storied, 6(six) units],  Type - III quarter 2(two) Block [Twin three storied, 12(twelve) units] , Type - II quarter 1(one) Block [Twin three storied, 6(six) units], Type - II quarter 1(one) Block [Twin double storied, 4(four) units] & Type - I quarter 2(two) Block [Twin three storied, 12(twelve) units]. 800.43 RDF 2010-11 550.15 August,2016. Work almost completed and ready for handed over.
7 Construction of New 10 nos. staff quarters (Type-I-4, Type-II-4 & Type-III-2) at Ambassa under Ambassa block, Ambassa Sub-Division, Dhalai District, Tripura. 225.00 IMR -
13th FC
2015-16 --- --- Tender invited.
8 Re-construction of Ganganagar PHC under Ganganagar block, Ambassa Sub-Division, Dhalai District, Tripura. 178.00 NHM 2015-16 --- ---

DPR send to the Director, FW&PM Deptt. on 06-08-2016 for according A/A & E/S.

Sanction awaited.

9 Construction of 10 nos. quarter at Hatimatha PHC, Gandacherra, Dhalai, Tripura. 172.80 SPA/ACA 2012-13 --- August,2016 Work completed.
WEST DISTRICT :-
1 Mohanpur Divison Construction of 10 bedded PHC at Lefunga. including 10 nos. staff quarters including Morgue, Kitchen, Boundary wall etc. at Lefunga, Mohanpur Sub-Division, West Tripura. 597.63 NHM 2014-15 --- August, 2017. Work upto lintel level in progress.
2 Re-construction of Bamutia PHC under Bamutia block, Mohanpur Sub- Division, West Tripura. 173.00 NHM 2015-16 42.50 July., 2017.

Work order issued.

3 Construction of New 10 nos. staff quarters (Type-I-4, Type-II-4 & Type-III-2) at Narshingarh under Bamutia block, Mohanpur Sub-Division, West Tripura. 225.00 IMR -
13th FC
2015-16 --- --- Work Order Issued.
4 Construction of new 10 bedded PHC building in place of existing Katlamara PHC under West Tripura District. --- --- --

---

---. Requisition received from Health Deptt. subsequently the same forwarded to the Sr. Architect, PWD for preparation of site plan and working Architectural drawing..
5 Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Chachubazar PHC, Mohanpur, West Tripura under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 RIDF-XVIII 2012-13

141.67

 

Completed Work completed and handed over.
5 Bishalgarh Re-construction of Anandanagar PHC under Dukli block, Sadar Sub- Division, West Tripura. 173.00 NHM 2015-16 --- December, 2017.

Tender Accepted..

6 Proposed construction of 06 nos. staff quarters (Type-I=04 nos & Type-III=02 nos) at Kanchanmala PHC, Dukli Block, West Tripura. 127.00 IMR -13th FC 2015-16 --- April, 2017. Work order issued.Work will be started soon.
7 Jirania Division Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Champaknagar PHC, Jirania, West Tripura under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 RIDF-XVIII/NABARD 2012-13 100.00 March,2017. Work upto lintel level for Type-I & II.
Type-III Arch. drawing has to be modified.
8 Community Health Centre (CHC) to a 50 bedded Sub-Divisional Hospital at Jirania, West Tripura (Up-gradation). 2003.00 NEC 2015-16 --- --- DNIT under preparation.
9 Medical College Division Construction of Office room and Drug Storage room for Central Medical Store, Shymalibazar, Agartala. 434.78   2015-16 --- --- Tender called.
8 Construction of District Ware House at different District in Tripura namely, (i) South Tripura (ii) North Tripura (iii) Khowai (iv) Sepahijala (v) West Tripura District. 1250.60 NHM 2015-16 --- --- Preliminary estimate sent to concerned Deptt. for A/A & E/S.
8 Construction of District Medical stores for District  Hospitals at (i) Santirbazar, (ii) Khowai, (iii) Kulai, (iv) Dharmanagar and (v) Bhagawannagar. 1782.20 IMR 2015-16 --- --- Preliminary estimate processed for according A/A & E/S.
KHOWAI DISTRICT :-
1 Khowai Divison Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Ampura PHC, Khowai District under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 RIDF-XVIII 2012-13 141.67  

Work order issued..

2 Construction of 10 bedded Primary Health Centre with 10 nos. quarters (Type-I=4 nos. Type-II=4 nos. & Type-IIII=2 nos.) at Champahour, Khowai District, Tripura. 385.00 IMR -
13th FC
2015-16 --- Feb,2018.

Work order issued.

3 Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Behalabari PHC, Khowai District under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 NABARD 2012-13 141.67 Dec, 2016. Type-I: Upto roof level completed.
Type-II : Finishing work in progress.
Type-III : Finishing work in progress.
4 Proposed construction of Type-III staff quarter (06 nos) and Type-IV staff quarter (06 nos) for Khowai Sub-Divisional Hospital at Khowai. 350.00 IMR -
13th FC
2015-16 --- ---

DPR sent to Health Deptt. in June.2016 for according A/A & E/S.

However, tender accepted and work order issued.

5 Re-construction of H.D. Smriti (Behelabari) PHC under Tukashikar block, Khowai Sub- Division, Khowai District, Tripura. 173.00 --- 2015-16 42.50 Dec., 2017. Tender received and under evaluation.
6 Teliamura Divison Construction of 10 bedded PHC at Uttar Maharanipur including 10 nos. quarters under Mungiakami Block, Khowai District, Tripura. 540.00 SPA 2014-15 230.00 Aug., 2017. Work is in progress.
7 Construction of 10 bedded PHC at Durgapur alongwith 10 nos. quarters, Khowai Sub-Division, Kalyanpur Block, Khowai District, Tripura. 540.00 RIDF-XX 2014-15 --- Dec., 2017. Foundation Earth work is in progress.
8 Construction of 10 bedded PHC at Mungiakami alongwith 10 nos. quarters, Teliamura Sub-Division, Khowai District. 540.00 NHM 2014-15 150.00 June, 2017 Completed upto First floor level.
9 Construction of new 30 bedded CHC building in place of existing Kalyanpur CHC under Khowai District. --- --- --- --- --- Requisition received from Health Deptt. subsequently the same forwarded to the Sr. Architect, PWD for preparation of site plan and working Architectural drawing.
10 Construction of 24 nos. staff quarters for 100 bedded Sub-Divisional Hospital at Teliamura [ Type-I = 06 nos.,  Type-II = 06 nos.,  Type-III = 06 nos. &  Type-IV = 06 nos. ] 583.00 --- 2016-17 --- --- DPR sent to Health Deptt. on 31-08-2016 for according A/A & E/S.
SEPAHIJALA DISTRICT :-
1 Sonamura Divison Proposed construction of 10 bedded PHC including 10 Nos. staff quarters with Morgue & Garrage building at Dhanpur, Sonamura, Sepahijala District, Tripura. 548.00 NHM 2014-15. 50.00 August, 2017. Work in progress for the PHC building.
2 Up-gradation of Sonamua CHC to 50 bedded Hospital, West Tripura. 1192.10 State Plan (SCA) --- 400.00 Sept,2016 Finishing work in progress including rooting in courtyard.
Addl. components are to be taken up for addl. sanction.
3 Proposed construction of 06 nos. staff quarters (Type-I=04 nos & Type-III=02 nos) at Kamalnagar PHC, Boxanagar Block, Sepahijala District, Tripura. 119.00 MSDP 2015-16 --- ---

Preliminary estimate processed to concerned Deptt. for A/A & E/S.

Sanction awaited.

4 Up-gradation of Melaghar Sub-Divisional Hospital / Construction of FRU wing. --- NHM 2016-17 --- --- Preliminary estimate is under preparation.
5 Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Jumerdhepa PHC, Sonamura, Sepahijala District, Tripura under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 RIDF-XVIII 2012-13

 

141.00

 

--- Tender being called.
6 Bishalgarh Divison Construction of 10 bedded PHC (single storey) at Bridhibazar, Bishalgarh, West Tripura including Quarter. 630.00 State Plan (RIDF) 2012-13 567.00 August, 2016. Ground floor completed except finishing. Roof casted for 1(one) block of 1st floor.
7 Construction of 10 bedded PHC with quarters at Madhupur under Sepahijala District, Tripura. 385.00 NHM 2016-17 --- --- DPR is under preparation.
8 Bishramganj Divison Construction of 10 bedded PHC at Lalsingmura, (Shikharia) Bishramganj, West Tripura. 791.31 State Plan (SPA) 2013-14 450.00 Sep., 2016.

PHC:- Finishing work in progress. 

QTR:- Type qtr. not yet started due to land dispute.

9 Proposed construction of 06 nos. staff quarters (Type-II=04 nos & Type-III=02 nos) at Takarjala CHC, Jampuijala Sub-Division, Sepahijala District, Tripura. 142.00 IMR -
13th FC
2015-16 142.00 --- Work Ordeer Issued.
10 Up-gradation of Briddhibazar PHC (under construction) to a 50 bedded Sub-Divisional Hospital at Jampuijala District, Sepahijala Tripura. 883.00 --- 2015-16 --- --- Revised DPR processed to concerned Deptt. on Jan.2016 for onward transmission to DoNER.
11 50 bedded Sepahijala District Hospital at Bishramganj, Sepahijala District, Tripura. --- NLCPR 2015-16 --- --- Preparation of Architectural drawing is in progress. On hold.
12 Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Dayarampara PHC, Sepahijala District, Tripura under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 IMR 2012-13 141.67 August, 2016.

Type-III:- I.E. Work is in progress for Type-III.

Type-II & I:- Superstructure of First floor in progress.

GOMATI DISTRICT :-
1 Udaipur Divison Re-construction of Maharani PHC under Matabari block, Udaipur Sub- Division, Gomati District, Tripura. 173.00 NHM 2015-16 --- June,2017.

Work in Progress

.
2 Construction of 10 bedded PHC at Nityabazar under Udaipur Sub-Division, Killa Block, Gomati District, Tripura. 540.00 RIDF-XX 2014-15 --- Sepetmber, 2017. Work order issued. Work to be started very soon.
3 Construction of 10 bedded Primary Health Centre with 10 nos. quarters (Type-I=4 nos. Type-II=4 nos. & Type-IIII=2 nos.) at Adipur, Udaipur, Gomati District, Tripura. 385.00 IMR -
13th FC
2015-16 --- Dec., 2017 Tender Accepted.
4 Up-gradation of Kakraban PHC to CHC at Kakraban, Udaipur, Gomati District.Tripura. 420.00 Revenue Dep. 2015-16 --- ---

Full sanction accorded.

DNIT is under preparation.

5 Construction of New 10 nos. staff quarters (Type-I-4, Type-II-4 & Type-III-2) at Tulamura under Kakraban block, Udaipur Sub-Division, Gomati District, Tripura. 225.00 IMR -
13th FC
2015-16 --- Sept., 2017.

1st call of tender accepted accordingly work order issued. But, work order cancelled.

2nd call invited.

6 Construction of 10 bedded PHC with quarters at Mirza under Kakraban Block Udaipur Sub-Division, Gomati District. --- NHM 2016-17 --- --- Temder Called.
7 Proposed construction of District Training Centre at Udaipur, Gomati District, Tripura. 597.40 IMR 2015-16 597.00 April, 2018. Work order issued. 
Structural drawing is under preparation.
8 Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Garjee PHC, Udaipur, Gomati District, Tripura under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 RIDF-XVIII 2012-13 141.00 Completed Work completed and handed over.
9 Construction of MCH wing at Gomati District Hospital, Tepania, Udaipur ---- NHM 2016-17 ---- --- Architectural drawing is under preparation.
10 Infrastructure Development of South District Hospital at Tepania, Udaipur, South Tripura / Construction of Staff Quarters & Development of Site including Internal Roads. Total 40 (Forty) Quarters [Type-IV-6 Nos., Type-III-12 Nos., Type-II-10 Nos. & Type-I-12 Nos./SH: Construction of Type - IV quarter 1(one) Block [Twin three storied, 6(six) units], Type - III quarter 2(two) Block [Twin three storied, 12(twelve) units] , Type - II quarter 1(one) Block [Twin three storied, 6(six) units], Type - II quarter 1(one) Block [Twin double storied, 4(four) units] & Type - I quarter 2(two) Block [Twin three storied, 12(twelve) units]/Building portion including internal water supply and sanitary installations. 800.43 State Plan (NABARD) 2010-11 567.51 Completed Work completed and handed over.
11 Amarpur Divison Proposed construction of 30 bedded CHC at Natunbazar, Amarpur Sub-Division, Gomati District, Tripura. 536.00 NHM 2015-16 --- ---

Preliminary estimate processed to concerned Deptt. For according A/A & E/S.

Sanction awaited.

12 Proposed construction of 10 bedded PHC building including 1o nos. staff quarters at Ghorakappa, Karbook, Gomati District, Tripura. 554-00 RIDF 2014-15 50.00 August, 2017 Foundation work in progress.
13 Proposed construction of 10 bedded PHC at Taido. 597.17 ACA/SPA 2010-11 537.71 August,2016. Plastering / Finishing work in progress.
14 Up-gradation of Karbook CHC to 50 bedded Sub-Divisional Hospital Karbook. 1327.00 RIDF 2015-16 --- --- Modified DPR (incorporating points of NEC) sent to the Health Deptt. on 26-06-2016 for according A/A & E/S.
15 Construction of Primary Health Centre including 10 nos. staff quarters at Tirthamukh under Amarpur Sub-Division, Gomati District. 548.00 NHM 2014-15 ---- November, 2017.

Work order issued to the agency. Site recently  handed over by Health Deptt.
A preliminary development work is in progress.

Structural drawing issued.

16 Construction of New 10 nos. staff quarters (Type-I-4, Type-II-4 & Type-III-2) at Chelagang under Karbook block, Karbook Sub-Division, Gomati District, Tripura. 225.00 MSDP 2015-16 --- Sept, 2017. Work order issued. Site development work is in progress.
17 Construction of Amarpur Sub-Divisional Hospital, Dhalai, Tripura. 2358.56 SPA 2012-13 685.80 Dec.,2016 Ground floor and 1st floor is completed. 80% of the 2nd floor.
Addl. components are to be taken up for addl. sanction.
SOUTH DISTRICT:-
1 Sabroom Divison Construction of 10 bedded PHC at Kalacherra with 10 nos. quarters Sabroom, South Tripura including Staff quarters. 385.00 NHM 2014-15 25.00 ---

 

Tender called.

A/A & E/S accorded.

2 Construction of 100 bedded Sub-Divisional Hospital at Sabroom, South Tripura. 2475.00 RIDF-XX 2015-16 --- --- alled.
3 Construction of 30 bedded CHC with quarters at Srinagar, Sabroom, South Tripura under State Plan (SCA) for the year 2012-13. 900.00 SCA 2012-13 650.00 Sept., 2016. Finishing work of main building in progress and roof slab of kitchen casted.
4 Constrcution of 10 bedded PHC with quarters at Manughat under Satchand Block, Sabroom Sub-Division, South Tripura District. --- NHM 2012-13     Tender called.
5 Santirbazar Divison Construction of Primary Health Centre at Ramraibari including Quarter. 630.00 RIDF 2012-13 576.79 August, 2016. Finishing work is in progress and Internal Electrification work not yet take up..
6 Construction of 10 bedded PHC at Durpabari under Santirbazar Sub-Division, Bagafa Block, South Tripura including Staff quarters. 540.00 RIDF-XX 2014-15 --- December, 2017. Foundation work started.
7 Re-construction of Muharipur PHC (single storied 10 bedded PHC) under Jolaibari block, Santirbazar Sub-Division, South Tripura. 173.00 IMR -
13th FC
2015-16 --- ---

2nd call tender called.

8 Construction of 10 bedded Primary Health Centre with 10 nos. quarters (Type-I=4 nos. Type-II=4 nos. & Type-IIII=2 nos.) at Debdaru, Santirbazar, South Tripura. 385.00 IMR -
13th FC
2015-16 --- ---

2nd call of tender is in progress.

9 Proposed construction of 10 (ten) nos. staff quarters [ Type -I quarter - 04 units (one block - twin double storey ), Type-II quarter - 04 units (one block - twin double storey ) and Type-III quarter - 02 units (one block - twin single storey ) ] at Kwaifang Primary Health Centre (PHC), Santirbazar, South Tripura District, Tripura / SH: Building portion including internal water supply and sanitary installation. 221.00 IMR Incentive Grants 2014-15 147.67 Oct., 2016. Work in progress.
10 Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Birchandramanu PHC, South Tripura under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 IMR 2112-13 153.44 October, 2016. Shuttering of 1st floor slab of Type-II & III started and Type-I upto lintel level.
11 Construction of 24 nos. staff quarters for 100 bedded District Hospital at Santirbazar [ Type-I = 06 nos.,  Type-II = 06 nos.,  Type-III = 06 nos. &  Type-IV = 06 nos. ] 583.00 ---- 2116-17 --- --- DPR sent to Health Deptt. on 30-08-2016 for according A/A & E/S.
12 Belonia Divison Construction of Primary Health Centre at Maichara including Quarter. 630.00 SPA/RIDF 2012-13 566.99 completed Work completed and ready for handed over.
13 Construction of 10 bedded PHC at Radhanagar under Belonia Sub-Division, Rajnagar Block, South Tripura including Staff quarters. 540.00 RIDF-XX 2014-15 --- Dec., 2017. Foundation work started.
14

Re-construction of Niharnagar PHC under Rajnagar block, Belonia Sub-Division, South Tripura.

173.00 NHM 2015-16 42.50 ---

Tender Accepted.

15 Proposed up-gradation of Rajnagar PHC to 30 bedded CHC at Rajnagar, Belonia, South Tripura.. 478.00 NHM 2015-16 --- May,2018.

Work order issued.

Structural drawing under preparation.

16 Proposed construction of 10 (ten) nos. staff quarters [ Type -I quarter - 04 units (one block - twin double storey ), Type-II quarter - 04 units (one block - twin double storey ) and Type-III quarter - 02 units (one block - twin single storey ) ] at Ratanpur Primary Health Centre (PHC), South Sonaicherri, South Tripura District, Tripura / SH: Building portion including internal water supply and sanitary installation. 221.00 IMR Incentive Grants - 13th F.C. 2013-14. 153.44 August, 2016. Work is in completion stage.
17 Construction of 10 nos quarters (Type-III: 2 nos, Type -II: 4 nos, Type-I: 4 nos) at Matai PHC, Belonia, South Tripura under RIDF-XVIII during the year 2012-2013/ SH: Building portion including internal water supply and sanitary installation. 221.46 IMR 2012-13 141.67 August, 2016 Type-I : Structural work completed. Finishing work is in progress.
Type-II: Not yet started. Required site is not there.
Type-III: Structural work completed and finishing work is in progress.
18 Proposed construction of 10 (ten) nos. staff quarters [ Type -I quarter - 04 units (one block - twin double storey ), Type-II quarter - 04 units (one block - twin double storey ) and Type-III quarter - 02 units (one block - twin single storey ) ] at Chottakhola Primary Health Centre (PHC), Rajnagar, Belonia, South Tripura District, Tripura / SH: Building portion including internal water supply and sanitary installation. 221.00 IMR Incentive Grants - 13th F.C. 2013-14 211.37 August, 2016. RCC work for Type-I, II & III upto roof level completed. Work is in progress.
16 Construction of 10 bedded PHC with quarters at Tripura Bazar under Hrishyamukh block, Belonia Sub-Division, South Tripura District. --- NHM 2016-17 --- ---- Tender Called.
VARIOUS DISTRICT WORKS:-
1 ---- Construction of District Medical Stores for District Hospitals at (i) Santirbazar, ii) Khowai (iii) Kulai (iv) Dharmanagar and (v) Bhagawannagar. 1782.20 IMR 2015-16 ---- --- Preliminary estimate sent to concerned Deptt. for A/A & E/S.
2 ---- Construction of District Ware House at different District in Tripura namely, (i) South Tripura (ii) North Tripura (iii) Khowai (iv) Sepahijala (v) West Tripura District. 1250.60 NHM 2015-16 --- --- Preliminary estimate sent to concerned Deptt. for A/A & E/S.

 

Higher Education Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostSchemeYear of SanctionedTotal Fund ReleasedTarget date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT :-
1 Agartala Division No-V, Agartala Construction of 1000 seated Auditorium for Ramthakur College, Agartala, West Tripura. 445.20 NLCPR 2012-13 425.00 Oct., 2016. Truss for roofing almost fitted. Plinth protection and side drain work is in progress..
2 Jirania Division Construction of General Degree College at Khumulwng (TTAADC) at Belbari, West Tripura/ Proposed Vertical Expansion of another one floor over existing Ground Floors of Academic Building and Administrative Building / SH : Building portion including internal water supply and sanitary installation. 350.00 SPA-tied 2015-16 --- Oct., 2017. Work Order Issued.
3 Construction of Academic Block for Khumluwng Govt. Degree College, Jirania, West Tripura under Special Plan Assistant (SPA-tied) during the year 2012-13(Phase-II). 305.00 SPA-tied 2012-13 ---- August, 2016. Funishing work is going on.
4 Agartala Division No-III, Agartala

Development of Infrastructure of MBB College, Agartala, West Tripura:-

 

a) Construction of composite Auditorium having students Common room, Council room & Canteen etc.

900.00 TFC 2012-13 2700.00 Oct., 2016.

Foundation work 90% completed.
G.Floor 60% completed.
Retaining wall 95% completed.

5 b) Construction of new building for Commerce & Management etc. 1000.00 TFC 2012-13 Completed

Work completed.

Combined LOC was placed for different TFC project.

5 Construction of (G+4) storied Office Building at Office Lane, Agartala, Tripura (W)/SH: Building portion including internal water supply and sanitary installations. 1113.00 SPA 2012-13 1053.05 Oct.,2016. Finishing work is in progress.
6 Proposed Construction of Annexe Block of Birchandra State Central Library at Agartala, West Tripura/ Phase-I: Western Block/Building portion including internal water supply and sanitary installation. 1647.00 Deposit 2013-14 569.90 March, 2017.

Due to shifting of transformer base work delayed and now started.

Foundation work upto 50% completed.

7 Proposed construction of English Medium Degree College at Old Central Jail Premises, Agartala. 5171.00 Deposit 2015-16 200.00 ---

First phase tender value Rs.2888.00 lakhs.

Work order issued. Test pile done.

First phase: Administrative, Academic & Library building.

8 Development of MBB College/Proposed construction of new Library building, Computer Centre Bank, Post Office & Co-operative Building, Guest House and Health Centre at MBB College Complex, Agartala, West Tripura. 1341.70   2015-16 --- --- Preliminary estimate processed to concerned Deptt. in the month of February' 2015 for A/A & E/S.
8 Development of MBB College/Proposed construction of Guest House at MBB College Complex, Agartala, West Tripura. 325.00   2015-16 --- --- Preliminary estimate processed to concerned Deptt. in the month of April, 2016 for A/A & E/S.
8 Special repair & Renovation of MBB College Complex Govt. Residential quarters / Type-IV quarters 24 nos. 109.13   2015-16 --- --- Preliminary estimate processed to concerned Deptt. in the month of Feb. 2016 for A/A & E/S.
GOMATI DISTRICT :-
1 Udaipur Division Construction of Polytechnic Institute at Fulkumari, Udaipur, Gomati, Tripura (Phase-II) /SH. i) Construction of Staff Quarters-15 Nos [ Type -I 04 Units, Type -II 04 Units, Type -III 05 Units and Type -IV 02 Units ] ii) 500 Seated Auditorium Building iii) Gymnasium Building iv) 100 Seated Boy's Hostel v) 50 Seated Girl's Hostel and vi) Development of Playground. 500.00 SPA-Tied 2013-14 920.00 Oct.,2016. Type qtr. Structure part completed, finishing work is in progress/500 seated auditorium building DNIT not yet received.
UNAKOTI DISTRICT :-
1 Kailashahar Division

R.K. Mahavidyalaya, Kailashahar

Administrative Building- (Three storied building. Only Ground floor is to be constructed in 1st Phase. Each floor is to measure 500 Sqm (Approx). (2007-08)/ Ph-1.

138.04 NLCPR 2012-13 --- June, 2016. i) 1 No. work shop completed upto plinth level. ii) Another 2 Nos. workshop foundation work in progress for one no. & Layout given to agency 1 no. respectively.
2 Construction of New Science Block at R.K. Mahavidyalaya, Kailashahar (Phase-II). 500.00 --- 2015-16 --- --- Tender received for Ground floor as per earlier sanction of Rs.500.00 lakhs with addl. sanction full building (G+2) may be taken up on cancellation of the tender for GF for completion of the building in one go for total UC of Rs.(5+10)=Rs.15.00 crores.
3 Proposed constrcution of Science Building (G+2) at Kailashahar College, Unakoti District, Tripura/Ground floor only under Phase-I. 507.00 --- 2015-16 --- --- Tender received and under evaluation.
NORTH DISTRICT :-
1 Dharmanagar Division GDC, Dharmanagar Administrative Building [G+2] - (Three storied building. each floor is to measure 500 Sqm (Approx) (2007-08). 1349.45 NLCPR 2012-13 --- --- Preliminary estimate processed to concerned Deptt. for A/A & E/S.
2 100 seated Boys hostel and quarters for faculties of Dharmanagar Degree College. 445.20 NLCPR 2012-13 425.00

Completed.

 

Building completed and handed over.
3 Dharmanagar General Degree college Academic Wing. 1341.70 ACA 2012-13 --- Completed. Building completed and handed over.
4 Construction of 3 (three) nos. Workshops for North Tripura District Polytechnic at Bagbassa, Dharmanagar, North Tripura. --- SPA 2014-15 --- March,2016. Structural work completed. Finishing work in progress.
5 Kanchanpur Division Construction of Model Degree College at GDC Kanchanpur under RUSA / (i) Vertical expansion of Academic building (1st floor) and (ii) Construction of 500 seated Auditorium. 540.00 RUSA 2015-16 --- ---

Tender called.

Part of A/A & E/s for Rs.275.00 lakhs only accorded.

DHALAI DISTRICT :-
1 L.T. Valley Division Construction of Model Degree College at L.T. Valley under RUSA / (i) Vertical expansion of Academic building (1st floor) and (ii) Construction of 500 seated Auditorium. 540.00 RUSA 2015-16 --- ---

Tender called.

Part of A/A & E/s for Rs.275.00 lakhs only accorded.

SOUTH DISTRICT :-
1 Santirbazar Division Construction of Model Degree College at Santirbazar under RUSA. 422.00 RUSA 2015-16 --- ---

DNIT issued for calling of tender.

Full A/A & E/s for Rs.422.00 lakhs accorded.

KHOWAI DISTRICT :-
1 Khowai Division Up-gradation of Dasarath Deb Memorial (DDM) College at Khowai, Tripura / Vertical extension of Administrative building (1st & 2nd floor) and Academic building (2nd floor) under SPA(tied) during the year 2015-16 (Phase-II)/SH: Building portion including internal water supply and sanitary installation. 500.00 --- 2015-16 --- --- Tender called.

 

Home Department (Police)

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
SEPAHIJALA DISTRICT :-
1 Bishramganj Division Construction of 7th BN TSR HQ at Jampuijala under Jampuijala Block Under 13th Finance Commission Award/SH: (i) Construction Of Administrative Building, (ii) 100 Men Barrack, (iii) Quarter Guard, (iv) Wireless Station, (v) Officer's Mess, (vi) SO's Mess, (vii) Store Building (viii) MT Office (ix) Magazine Store Building (x) MT Garrage (xi) Watch Tower and (Xii) Boundary Wall/Civil works including Internal water supply and Sanitary installation of building portions. 1500.00 TFC --- 1495.00 March, 2016.

Admn. Bld, TSR Store, Officers Mess, Quarter Guard, SO's Mess, Wireless and communication building work completed and handed over.

MT Office, Megazine store building, MT Garrage, 100 men barrack (1st & 2nd), Type-V qtr, Watch Tower are works completed. But not taken over by TSR.

Boundary wall in progress.

2 Construction of 11th BN. TSR Head Quarter at Pathaliaghat, Bishramganj, West Tripura under 13th Finance Commission award/SH. Construction of 100 Men Barrack/Building portion including internal water supply and sanitary installations. 1500.00 TFC --- 943.56 April, 2016 Work completed except internal electrification.
3 Construction of 11th BN. TSR Head Quarter at Pathaliaghat, West Tripura under 13th Finance Commission Award/SH: (i) Construction Of Administrative Building, (ii) 100 Men Barrack, (iii) Quarter Guard, (iv) Wireless Station, (v) Officer's Mess, (vi) SO's Mess, (vii) Store Building (viii) MT Office (ix) Magazine Store Building (x) MT Garrage (xi) Watch Tower and (Xii) Boundary Wall/Civil works including Internal water supply and Sanitary installation of building portions. ---

MT Office / MT Garrage, Megazine Store buildilng, 100 Men Barrack(1st) completed and handed over.

100 Men Barrack (2nd), Admn. Bld., Store building, Officers Mess, Quarter Guard, SO's Mess, Wireless & Communication building, Watch Tower are finishing work completed 80% and balance in progress.

4 Bishalgarh Division Construction of New PS building at Madhupur, Sepahijala District, Tripura. 168.00 --- --- --- --- Preliminary cost estimate sent to concerned deptt. for according A/A & E/S.
5 Construction of  6(six) Nos.  Type -III quarter [ 1(one) Block - twin (G+2) storied] at 1st TSR Hqts. Gakulnagar, Sepahijala District, Tripura under MoPF Scheme -2013-14/SH: Building portion including internal water supply and sanitary installation. 145.00 MOPF 2014-15 --- Completed Work completed and ready for handed over.
6 Construction of Administrative Building and 50 Men Barrack at 1st BN TSR HQ Complex at Gakulnagar, Sepahijala District, Tripura. 619.00 MOPF 2014-15 --- ---

DNIT is ready.
Full E/S to be accorded.

A/A accorded = Rs.619.00 lakhs
E/S accorded = Rs.135.00 lakhs

UNAKOTI DISTRICT:-
1 Kailashahar Division Kailasahar Women Police Station at Kailasahar, North Tripura. 78.45 MOPF --- 75.00 March, 2016. Work is in completion stage.
No fund is placed to EE, KLSD.
DHALAI DISTRICT :-
1 L T Valley Division Construction of 8th BN TSR H.Q. at Lalcherra, Long-Tarai Valley, Manu, Dhalai:-. 1500.00 TFC --- 1323.00 ---

(i) Barrack-I: Roof of ground floor work suspended till Dec.2015. Work will be completed by Jul.2016.
(ii) Barrack-II: 80% of 1st floor completed, in progress. Work will be completed by May.2016.
(iii) SOS Mess: NPCC 50% roof casted of ground  floor. Work will be completed by May.2016.
(iv) Quarter Guard: Roof of Ground floor. Work will be completed by Jul.2016.
(V) Administrative building: Lintel of Ground Floor. Suspended till Oct.2015. Work will be completed by Jul.2016.
(vi) MT Office and Garrage: Ground floor roof completed. Work will be completed by Apl.2016.

2 Construction of 2(two) nos. Type-II quarter  at Dhumacherra Police Station, L.T. Valley, Dhalai. 48.99 MOPF 2014-15 --- --- Clear site recently handed over. Foundation work completed. Work is in progress.
3 Ambassa Division Construction of 6(six) Nos. Type -III quarter [ 1(one) Block - twin (G+2) storied] at Police Line Ambassa, Dhalai District, Tripura under MoPF Scheme -2013-14/SH: Building portion including internal water supply and sanitary installation. 145.00 MOPF 2014-15 --- --- Work upto plinth level.
4 Infrastructural Development of Gandacherra Sub-Division, Dhalai District /Construction of Police Station 3235.00 SCA
(un-tied)
---- --- May,2017. Architectural drawings under preparation.
5 Kamalpur Division Construction of 6(six) Nos. Type-II Quarters [ 1(one) Block - twin (G+2) storied ] at Kachucherra P.S. Complex, Dhalai District, Tripura under MoPF Scheme, 2014-15/SH: Building portion including internal water supply and sanitary installation. 128.94 MOPF 2014-15 128.94 Feb., 2016. Work completed and ready for handed over.
WEST DISTRICT :-
1 Agartala Division No-V Construction of 36(thirty six) Nos. Type -II quarters [ 6(six) Block - twin (G+2) storied ] at A.D. Nagar Police Line, Agartala, West Tripura under MoPF Scheme -2013-14/SH: Building portion including internal water supply and sanitary installation. 773.82 MOPF 2014-15 20.00 --- Work could not be started as clear site is not available. (Work order issued on 27-03-2015)
2 Mohanpur Division Establishment of Police Academy at Narsingarh, West Tripura under 13th Finance Commission Award/SH: (i) Construction of 100 Persons Men's Barrack, (ii) Vertical extension of Women's Barrack, (iii) Training Institute, (iv) SI Cadet Hostel, and (v) Front compound wall (425m.)/Civil works Including Internal Water Supply and Sanitary Installations of Building Portions. 1000.00 TFC --- 900.00 Completed (i) Finishing work completed, (ii) Womens barrack completed and handed over, (iii) Finishing completed, (iv) Finishing completed, (v) 850.00 mtr. Completed. Work completed in all respect and ready for handing over.
3 Construction of 6(six) Nos. Type -III quarter [ 1(one) Block - twin (G+2) storied ] at KTDS, PTA, Narsingarh, West Tripura under MoPF Scheme -2013-14/SH: Building portion including internal water supply and sanitary installation. 145.00 MOPF 2014-15 --- Feb, 2016. Work nearing completion.
4 Jirania Division Construction of 6(six) Nos. Type-II Quarters [ 1(one) Block - twin (G+2) storied ] at Radhapur P.S. Complex, Jirania Sub-Division, West District, Tripura under MoPF Scheme, 2014-15/SH: Building portion including internal water supply and sanitary instal 129.00 MOPF 2014-15 --- March, 2016. Work nearing completion.
SOUTH TRIPURA DISTRICT :-
1 Santirbazar Division Development of Infrastructure of 9th BN TSR HQ at Hichacherra, Santirbazar 1500.00 TFC --- 1527.00 April, 2016. Finishing work of Boundary wall, 75% of Officer's Mess in progress and 95% of 100 men Barrack completed.
2 Construction of New PS building at Baikhora, South Tripura. 168.00 --- 2014-15 --- ---

Preliminary cost estimate sent to concerned deptt.  for according A/A & E/S.

Sanction awaited.

3 Belonia Division Construction of New building for District SP Office at Belonia, South Tripura. 817.00 --- 2014-15 --- ---

Tender called.

A/A accorded = Rs.817.00 lakhs
E/S accorded = Rs.114.00 lakhs
Full E/S to be accorded.

4 Construction of New PS building at Belonia, South Tripura. 635.00 --- --- --- --- Preliminary cost estimate sent to concerned deptt. for according A/A & E/S.
5 Construction of NGO Mess and development of a Parade ground with drill shed at Police Line under South Tripura District. 50.99 --- --- 60.00 Fer.,2016. Work is in progress.
GOMATI DISTRICT :-
1 Amarpur Division. Construction of 6(six) Nos. Type-II Quarters [ 1(one) Block - twin (G+2) storied ] at Karbook P.S. Complex, Gomati District, Tripura under MoPF Scheme, 2014-15/SH: Building portion including internal water supply and sanitary installation. 129.00 MOPF 2014-15 --- June, 2016.

Clear site handed over to the agency as on 20.06.2015. Layout has been taken up by the agency.

Foundation work is in progress.

KHOWAI DISTRICT :-
1 Teliamura Division Construction of 6(six) Nos. Type-II Quarters [ 1(one) Block - twin (G+2) storied ] at Mungiakami P.S. Complex, Teliamura Sub-Division, Khowai District, Tripura under MoPF Scheme, 2014-15/SH: Building portion including internal water supply and sanitary 129.00 MOPF 2014-15 --- June, 2016. Superstructure is in progress.
2 Khowai Division Construction of New building for District SP Office at Khowai, Khowai District, Tripura. 1413.00 --- 2014-15 --- ---

Preliminary cost estimate sent to concerned deptt. for according A/A & E/S.

UP-Coming Work.

 

Information Cultural Affairs Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostSchemeYear of SanctionedTotal Fund ReleasedTarget date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
UNOKOTI DISTRICT
1 Kumarghat Division Proposed 1000 seated capacity Town hall at Kumarghat, Unakoti District. 1180.00 -- 2015-16 100 December, 2017. Revised (New) site not yet been selected to the PWD.
KHOWAI DISTRICT
1 Khowai Division Cultural complex at Khowai Town, West Tripura. 630.00 SPA 2010-11 700 February 2016 Completed except innside painting and installation of PA system and sitting arrangement.
WEST DISTRICT
1 Agartala Division No 1.  Development of Rabindra Parishar at Children’s Park, Agartala, Tripura.(Open Air Stage) 200.00 I.C.A Deptt. 2013-14 100 February 2016

Site handed over. Layout finalised. After completion of drain work will commence.

2 Development of Children Park. --- I.C.A Deptt. ------ ---- Completed Completed.
3 Development of Rabindra Parishar at Children’s Park, Agartala, Tripura. --- I.C.A Deptt. ---- --- Oct.2015 Work completed.
1 Agartala Division No-III, Agartala Renovation of Town Hall at Agartala/ SH.Modification of Green Room, Ceiling, Acoustic works on wall & Ceiling, Flooring, Internal lighting, Audio system and Fire fighting etc.. 574.00 SPA, Tied 2014-15 210.36

February. 2016

50% work completed. Work in progress..

 

Jail & Sub-Jails

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
SEPAHIJALA DISTRICT:
1 Bishalgarh Division Construction of 56 Nos Type-II & 24 Nos Type-III residential quarters at Kendriya Sansodhanagar Complex at Bishalgarh (Balance work - Phase-II)/ SH: Building portion including internal water supply and sanitary installation. 695.63 MOPF 2015-16 --- Ahgust, 2017

(i) Type-III=16 units work almost completed balance 8 units work are in progress.

(ii) Type-II-36 units work in progress out of 56 units.

2 Sonamura Division Proposed Construction of new Sub Jail at Sonamura, Sepahijala, Tripura (Phase-I) / SH: Construction of i] 100 Seated Prisoners Ward ( Male) ii] 25 Seated Prisoners Ward (Female) iii] 10 Seated Prisoners Cell iv] Administrative Block v] Watch Tower /Building portion including internal water supply and sanitary installation. 736.99 SPA 2011-12 1285.23 Feb. 2016 Finishing work in progress.
UNAKOTI DISTRICT:
1 Kailashahar Division Construction of Kailasahar District Jail at Kailasahar, Unakoti District, Tripura / SH: Construction of i] 100 Seated Prisoners Ward (Male) ii] 25 Seated Prisoners Ward (Female) iii] 10 Seated Prisoners Cell iv] Administrative Block v] Office & Visitor room vi] Guard room vii] Kitchen Room viii] Dining Hall ix] Barrack for 15 person x] Internal boundary wall xi] Internal boundary wall surrounding female ward xii] Perimeter Wall xiii] Watch Tower and xiv] Staff Quarters {Type-I - 8 Units - (02 Block twin-double storied), Type-II - 8 Units -(02 Block twin-double storied) & Type-III- 8 Units-(02 Block twin-double storied)}/Building portion including internal water supply and sanitary installation. 1597.69 SPA 2013-14 441.74 Sep.2016

Work is in progress.

NORTH DISTRICT:
1 Dharmanagar Division Construction of Sub-Jail at Dharmanagar, North Tripura / SH: Construction of i] 100 Seated Prisoners Ward (Male) ii] 25 Seated Prisoners Ward (Female) iii] 10 Seated Prisoners Cell iv] Administrative Block v] Office & Visitor room vi] Guard room vii] Kitchen Room viii] Dining Hall ix] Barrack for 15 person x] Internal boundary wall xi] Internal boundary wall surrounding female ward xii] Jail Perimeter Wall xiii] Watch Towers xiv] Staff Quarters { Type-I - 04 units (01 Block twin-double storied), Type-II-12 units - (02 Block twin- three storied) & Type-III - 08 units - (02 Block twin - double storied)} and xv] Medical Unit / Building portion including internal water supply and sanitary installation. 1597.69 SPA 2013-14 733.34 January, 2017. 25 seated female ward and 10 seated cell building foundation work is in progress. 100 seated ward building structural part completed. Finishing work is in progress. Administrative block upto ground floor lintel level completed. Type-II, III buildings upto floor-II level completed. One no watch tower is in progress.
DHALAI DISTRICT:
1 Ambassa Division Construction of District Jail at Ambassa, Dhalai District, Tripura / SH: Construction of i] 100 Seated Prisoners Ward (Male) ii] 25 Seated Prisoners Ward (Female) iii] 10 Seated Prisoners Cell iv] Administrative Block v] Office & Visitor room vi] Guard room vii] Kitchen Room viii] Dining Hall ix] Barrack for 15 person x] Internal boundary wall xi] Internal boundary wall surrounding female ward xii] Perimeter Wall xiii] Watch Tower and xiv] Staff Quarters {Type-I - 8 Units - (02 Block twin-double storied), Type-II - 8 Units -(02 Block twin-double storied) & Type-III- 8 Units-(02 Block twin-double storied)}/Building portion including internal water supply and sanitary installation. 1621.23 --- --- --- ---

1st call tender rejected.

A/A & E/S received in Aug.2015 for Rs.10.84 Crores.
However, DPR sent for Rs.16.21 crores.

DNIT is ready to be issued soon.

Full A/A & E/S is to be accorded.

SOUTH DISTRICT:
1 Santirbazar Division Construction of Sub-Jail at Santirbazar, South Tripura / SH: Construction of i] 100 Seated Prisoners Ward (Male) ii] 25 Seated Prisoners Ward (Female) iii] 10 Seated Prisoners Cell iv] Administrative Block v] Office & Visitor room vi] Guard room vii] Kitchen Room viii] Dining Hall ix] Barrack for 15 person x] Internal boundary wall xi] Internal boundary wall surrounding female ward xii] Jail Perimeter Wall xiii] Watch Towers xiv] Staff Quarters { Type-I - 04 units (01 Block twin-double storied), Type-II-12 units - (02 Block twin- three storied) & Type-III - 08 units - (02 Block twin - double storied)} and xv] Medical Unit / Building portion including internal water supply and sanitary installation. 1570.00 --- --- --- --- DPR sent to the concerned Department in the month of Jan.2016 for according A/A & E/S.
UPCOMING:
1   Construction of 1(one) room for the Female prisoners having children with them in 9 (nine) Jaills / Sub-Jails at different places of Tripura. --- SCA, Limited 2015-16 --- --- Model preliminary cost estimate is under preparation. However, A/A & E/S accorded for Rs.120.00 lakhs.

 

Labour Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT:
1 Agartala Division No-III, Agartala Construction of G+3 (4 storied) building for Labour & Employment and other Departments, Agartala, West Tripura/(Phase-I) Part Piling & Allied Foundation 1576.72 SPA, Tide 2014-15 90.00 March,2017 110 nos. piles completed out of 338 nos. pile. Work in progress.

Minority Welfare Department 

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
NORTH DISTRICT
1   Construction of 50 seated Girls Hostel attached to Fhulbari Class-XII School at Kadamtala, Dharmanagar, North Tripura. 293.12 MSDP 2015-16 -- ---

Preliminary estimate sent to the concerned Deptt. on 25-03-2015 for according A/A & E/S.

A/A & E/S is still awaited.

SEPAHIJALA  DISTRICT
1 Sonamura 
 Division
Up-gradation of Boxanagar PHC to 30 bedded CHC at Boxanagar, Sepahijala District, Tripura. 644.00 MSDP 2015-16     DPR  sent to theHealth Deptt. for according A/A & E/S in January-2016
2 Construction of 100 seated Girls Hostel attached to Madhya Boxanagar High Madrassa at Boxanagar, Sepahijala District, Tripura. 586.56 MSDP 2014-15    

Preliminary estimate sent to the concerned Deptt. On 25-03-2015 for according A/A & E/S.

A/A & E/S is still awaited.

3 Construction of School Building for South Paharpur H.S. School under South Paharpur GP, Sepahijala District, Tripura.   MSDP 2015-16     Architectural drawing yet to be received.
4 Construction of School Building for South Nirvoypur H.S. School under Nirvoypur GP, Sepahijala District, Tripura.   MSDP 2015-16     Architectural drawing yet to be received.

Law Department 

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT:
1 Capital Complex Division Construction of Chief Justice Bungalow & other Judges Bungalows at Capital Complex located near by the NEW GOVERNOR HOUSE SITE. --- --- --- --- --- Tender Received.
2 Agartala Divn. No.III Division Construction of Multi-storied Court Building (G+5) in the Court Complex of District & Sessions Judge, Agartala ,West Tripura/SH. Building portion including Internal water supply, Sanitary installation, Internal Electrification i/c Fire Detection, Alarm System and Public Address System. 735.85 State (Non Plan) 2013-14 -- December, 2017. pile Work commenced.
3 Construction of Tripura Judicial Academy at Narsingarh, West Tripura/Construction of quarters of the Director, Dy. Director and 3(three) nos. each Type-III and Type-II quarters for Grade-III staffs. 266.74 --- 2015-16 --- --- ---
GOMATI DISTRICT:
1 Udaipur Division Construction of 2[two] Nos. of Grade-I Officers Quarters and 4[four] Nos. of Grade-III Officers Quarters at Udaipur District & Session Judge's Court Complex/SH: Building portion including internal water supply and sanitary installation. 390.74 CSS 2013-14 412.83 Dec., 2016. 4 Nos. Grade-III qtr. Is in progress.
3 Amarpur Division Construction of proposed Court building at Amarpur, Gomati District, Tripura/ SH: Building portion including internal water supply and sanitary installation. --- --- --- --- --- Clear site not available. Existing structure to be demolished. Architect, PWD is on exercise.
SOUTH DISTRICT:
1 Sabroom Division Construction of proposed Court building at Sabroom, South District, Tripura/ SH: Building portion including internal water supply and sanitary installation. 680.00 CASP 2014-15 --- --- Tender accepted.
KHOWAI DISTRICT:
1 Khowai Division Construction of proposed Court building at Khowai, Khowai District, Tripura/ SH: Building portion including internal water supply and sanitary installation. 1586.00 CASP 2014-15 --- --- Tender accepted.
UNAKOTI DISTRICT:
1 Kailashahar Division Construction of proposed Court building at Kailashahar, Unakoti District, Tripura/ SH: Building portion including internal water supply and sanitary installation. ----- ------ 2015-16 ---- ------ Architectural working drawings are yet to be received.

 

Nagar Panchayet Department 

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
DHALAI DISTRICT
1 Ambassa Division Construction of Nagar Panchayat Office Building at Ambassa, Dhalai, Tripura/SH: Building portion including internal water supply & Sanitary installation. 317.21 ---- ---- ---- ---- A/A & E/S awaited.
SEPAHIJALA DISTRICT
1 Bishalgarh Division Construction of Nagar Panchayat Office Building at Bishalgarh, Sepahijala, Tripura/SH: Building portion including internal water supply & Sanitary installation. 317.21 -- 2014-15 -- -- Related drawing has been sent to the Director of Urban Development for approval
KHOWAI DISTRICT
1 Khowai Division Construction of Nagar Panchayet at Khowai, West Tripura/SH: Building portion including internal water supply and sanitary installations. 244.39 Deposit 2014-15 130.00 December, 2015. Work in finishing Stage.
SOUTH DISTRICT
1 Sabroom Division Construction of Nagar Panchayet at Sabroom, South Tripura/SH: Building portion including internal water supply and sanitary installations. 239.54 Deposit 2014-15 170.00 Completed Work completed and handed over
2 Santirbazar Division Construction of Nagar Panchayat Office Building at Santirbazar, South Tripura/SH: Building portion including internal water supply & Sanitary installation. 317.21 --- 2014-15 ---- ---- A/A & E/S awaited.
UNAKOTI DISTRICT
1 Kailashahar Division Construction of Nagar Panchayet at Kailashahar North Tripura /SH: Building portion including internal water supply and sanitary installations. 150.54 ---- --- 213.46 Dec., 2015 Work completed and handed over.
2 Kumarghat Division Construction of Nagar Panchayet at Kumarghat, North Tripura /SH: Building portion including internal water supply and sanitary installations. 242.49 Deposit ---- 164.00 Deceber, 2015 Work Completed.

North Eastern Council (NEC)

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
DHALAI DISTRICT
1 Ambassa Division Manu - Chamanu - Gobindabari road
(Project revised in
2012-13 to ` 1488.00 lakh. Earlier cost was
` 956.00 lakh) 
1488.00 NEC 2004-05 1388.89 March, 2016.   F :15.30 Km.
Widening: 9.50 km
GSB : 8.00 Km.
WBM-II : 8.00 Km
WBM-III: 6.00 km
RW : 812.00 Mtr.
CD : 36  Nos.  completed &
2 Nos. in progress.
Road side drain: 6300 m.
NORTH DISTRICT
1 Dharmanagar Division Dharmanagar - Tilthai - Damcherra road.
(Project revised in
2012-13 to ` 8167.00 lakh. Earlier cost was
 ` 6625.00 lakh.) 
8167.00 NEC 2006-07 8077.78 April, 2016. F : 53.526 Km.
GSB : 53.526 Km.
WBM (1st layer) : 53.526 Km.
WBM (2nd layer) :53.526 Km.
DBM :53.526Km.
C: 53.526 Km.
CD : 59 Nos.
Side drain : 15.90 Km.
R/W: 881.00 Mtr.
B : 9 Nos. completed and
2 Nos. in progress.
SHEPAHIJALA DISTRICT
1 Bishalgarh Division Bishalgarh - Boxanagar - Sonamura - Barpathari - Belonia Road
(Revised estimate for `251.02 crore sent during 2013-14)
19597.00 NEC 2010-11 19483.32 March, 2016. F : 86.63 Km.
GSB :  86.63 Km.
WMM: 85.28 Km
DBM: 85.07 Km
PMC: 60.00 Km
RW:Completed
Drain: Completed
CD: Completed
Br :6 Nos. completed
1 No. in progress.

NON LAPSABLE CENTRAL POOL OF RESOURCES (NLCPR)

(In Lakhs)
SL. No.DivisionName of WorksSanction CostReleased Under Central ShareReleased Under State ShareTotal Fund ReleasedExpenditureStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 Jirania Division "Construction of RCC bridge over river Howrah at Ch.0.10 Km on Champaknagar to Udaipur Road." 301.67 212.94 23.66 236.60 236.60 Bridge completed. Work of approach will be started shortly. //
Target date of completion: July,2016.
Reply of clarification submitted on 12.1.16.Requisition for balance fund submitted.
2 Road of Connecting Railway Station to N.H/ SH 4(Four) Nos. in Tripura 1620.28 1437.38 127.77 1565.15 1277.67 Jirania ,Teliamura, Mungiakami & Ambassa  Rly station- completed.  // Fund released on 24.11.15.
Target date of completion:
March, 2016
3 Mohanpur Division "Construction of RCC bridge over river Dhanai at Ch: 6.60 Km on Champaknagar - Mandai Road." 321.34 198.65 22.07 220.72 211.53 Bridge completed. Carpeting of Approach road yet to be done. //  UC  submitted on 13.1.2016
Target date of completion: February,2016.Requisition for balance fund submitted.
4 Jogendranagar to Takarjala road (24.32 K.M) in Tripura 3679.60 2649.30 147.18 2796.48 1471.83 Formation: 17.70 Km, GSB: 16.62 Km,
 WBM-II: 16.62 Km   & WBM-III: 16.62 Km, BM & PMC 8.5 km
CD: 44 nos. & Widening of existing CD: 28 nos completed.  //
Fund released on 24.11.15.
Target date of completion:
March, 2017
NORTH DISTRICT
1 Kanchanpur Division "Construction of RCC bridge over Ujan Machmaracherra at Ch.9.00 Km on Kanchanpur to Jalbassa Road." 307.01 221.04 24.56 245.60 245.60 Bridge completed.
Work of approach yet to be started. // Target date of completion: March 2016. Requisition for balance fund submitted.
2 Improvement & Upgradation of the road connecting Sub Divisional H.Q. with NH-44/ Perchartal (NH-44) to Kanchanpur road (26.50 Km)/ Phase-I portion from pechartal to Machmara (8.50 Km). 2488.56 895.88 99.54 995.42 ---  Widening work almost completed. Preiminary work of 2 nos bridge and 17 nos CD started. //
Work awarded on 12.06.2015.
Stipulated date of completion 11.06.2017.
3 Construction of RCC bridge over Baradupatacherra at Ch: 2.80 Km on Kanchanpur to Jalbassa Road. 387.62 272.61 30.29 302.90 302.90  Fabrication and placing  of Superstructure completed. Casting of deck slab will be started shortly. // Target date of completion:
March, 2016.
Reply of clarification submitted on 8.1.16.Requisition for balance fund submitted.
DHALAI DISTRICT
1 Ambassa Division "Halahali- Ambassa- Dangabari- Amarpur- Bagasa-Belonia Road (173 K.M) Implementing by BRO/BRTF." 18909.00 16285.00 963.00 17248.00 14797.00 BRO is implimenting the work Road work completed. Works suspended by BRO before completion of 4 nos. of bridges. // Prposal for taking/ handing over by PWD(R&B) from BRO  sent to DoNER.

Panchayet Department 

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1   Construction of Auditorium at Panchayati Raj Training Institute at A.D. Nagar, Agartala, West Tripura/SH: Civil Works, Plumbing Works, Stage Works including Stage Lighting, Internal Electrification, Sound system & HVAC Work. 1001.00 -- 2015-16 -- -- Tender accepted.

Public Works Department (R&B)

 

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT :-
1 Capital Complex Division Construction of a composite building for Accommodation of different offices of PWD at Capital Complex, Khejurbagan, Agartala / Construction of Lower Ground Floor and Upper Ground Floor only / SH: Building portion including internal water supply and sanitary installation. 1406.3 PWD Plan 2013-14 --- Jun,2016 Work in progress, but slow.
2 Construction of New Rajbhavan at Khejurbagan, Agartala, West Tripura. 3000.00 TFC --- 2185.00 March, 2016. Work in progress.
3 Construction of MLA Hostel at Capital Complex,Agartala, West Tripura. 5215.00 SPA, Tied. 2014-15 --- --- Tender accepted.
4 Agartala Division No.III, Agartala Construction of 8(eight) Nos. Type -I quarter [1(one) Block - twin (G+3) storied ] and 8 (eight) Nos. Type -II quarter [1(one) Block - twin (G+3) storied ] at Melarmath, Agartala, West Tripura /SH: Building Portion including internal water supply and sanitary installation. 416.00 Housing ( Civil Works) 2014-15. --- August, 2017 Work order issued. Site handed over. Pile work will be started after receive of test report of M25 grade Conct & Steel.
5 Construction of Minister's Bungalow [3 (three) Nos] including Boundary wall at Agartala, West Tripura/SH: Building Portion including internal water supply and sanitary installation. 555.09 --- 2015-16 --- --- Tender accepted.
6 Proposed construction of Chief Ministers Bungalow including Frisking & Barrack, Type-II Quarters (One Unit) and Boundary wall at Agartala, West Tripura. 467.31 --- 2015-16 --- --- Tender accepted.
NORTH DISTRICT :-
1 Dharmanagar Division Construction of 6(six) nos. Type-II Qtr. [1(one) Block-twin G+2] storied at Dharmanagar PWD Complex, North Tripura during the year 2014-15. 133.92 --- 2014-15 --- --- Preliminary cost estimate processed for approval.
6 Construction of 6(six) nos. Type-III Qtr. [1(one) Block-twin G+2] storied at Dharmanagar PWD Complex, North Tripura during the year 2014-15. 147.64 --- 2015-16 --- --- Preliminary cost estimate processed for approval.

 

Revenue Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
KHOWAI DISTRICT
1 Khowai Division Proposed construction of office building for District Megistrate and Collector at Khowai, Tripura under Special Plan Assistant (SPA' tied) during the year 2013-2014. 504.42 SPA, Tide       Preliminary estimate processed to concerned Deptt.for A/A & E/S.
2 Construction of composite office building of the DM & Collector, Khowai District. 1950.73         Preliminary estimate sent to concerned Deptt. for A/A & E/S.

 

School Education Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7
WEST DISTRICT :
1 Agartala Divn. No-III, Agartala. Up-gradation of infrastructure of Netaji Subhash Vidhanikatan H.S. School under ACA/Phase-II. 263.76 SCA (Un-Tide) 2015-16 300.00 Completed

Work completed.

Revalidation of Rs.100.00 lakh for the year 2012-13 is still required.

.
2 Proposed construction of a New Block for Bijoy Kumar Girl's H.S. School including Campus Hall at Agartala, West Tripura. 874.00 SPA 2013-14 180.00 April, 2016 Superstructure completed.
3 Up-gradation of infrastructure etc. of Netaji Subhash Vidhanikatan, Agartala (i) Dev. Of playground with drainage facilities and installation of one befitting entrance gate at the middle section (ii) Construction of storm water drainage. 233.00 SDS 2015-16 230.00 March, 2016 3 Nos. work order issued. Earth work in field is in progress. Other works not yet started due to land problem.
4 Construction of Triple storied  New Block at Northern side of Netaji Subhash Vidhanikatan H.S. School, Agartala. 840.00 SPA' Tied 2014-15 --- --- Tender called.
5 Earth filling at the back side water bodies at Netaji Subhas Vidya Niketan and Construction of boundary wall 50.00 SCA
(un-tied)
2015-16 --- August, 2015.

Partly completed but land problem is there.

Rs.25.00 lakh revalidated in 2015-16.

6 Proposed extension of Umakanta Academy, Agartala, Tripura. 651.91 SPA, Tide 2014-15 --- Jun, 2017 Work order issued.
Dismantaling work started.
Foundation work will be started soon.
7 Construction of Academic and Administrative Block for DIET in Agartala, West Tripura. 940.00 State Plan 2014-15 --- August, 2017. Foundation work started.
GOMATI DISTRICT :
1 Udaipur Division Up-gradation of Infrastructure of Administrative and Academic Block for DIET, Kakraban Udaipur, South Tripura under SPA during the year 2011-12/SH: Building portion including internal water supply and sanitary installation. 1000.00 SPA 2011-12 700.00 Completed Work completed and ready for handing over.
2 Proposed Construction of building (two storeyed) for Matabari High School at Matabari, Udaipur, Tripura (South)/SH: Building portion including internal water supply and sanitary installation. 400.00 SPA 2011-12 201.50 March, 2016. Finishing work, Painting & flooring work is in progress.
3 Construction of English Medium School Building at Udaipur, Gomati District. --- --- 2015-16 --- ---

Approved Architectural drawing received.

Preliminary cost estimate under preparation.

4 Up-gradation of Infrastructure of Udaipur Girls H.S.School, Udaipur, South Tripura under ACA (SPA Tied) during the year 2011-12 (2nd Phase). 500.00 SCA (SPA) 2011-12 500.00 Mar. 2016 Partly handed over and balance portion finishing work is in progress.
5 Construction of South Bagma Samatalpara H.S. School at Bagma, Udaipur. -- --- 2015-16 -- ---

Architectural drawings are yet to be approved from the SED.
E/S awaited  for calling of tender.

6 Up-gradation of infrastructure for Ramesh H.S. School at Udaipur, Gomati (Phase-II)/Vertical extension. 577.80 SCA (un-tied) 2015-16 500.00 Mar. 2016 South and West part handed over. Balance portion (East Part) upto roof level.
7 Amarpur Division Up-gradation of Infrastructure of Karbook Panjiham H.S. School under Gomati District, Amarpur Division. (2013-2014) 787.00 SPA 2014-15 --- ---

Work order issued.

Structural drawing to be issued soon.

8 Construction of Silachari H.S. School at Silachari under Gomati District, Tripura (2013-14) 972.00 SPA 2013-14 --- ---

Tender will be processed to WAB for acceptance.

SOUTH DISTRICT :
1 Sabroom Division Up-gradation of Infrastructure of Manu H.S School, Sabroom, South Tripura under State Plan (SPA) during the year 2010-2011/SH: Building portion including internal water supply and sanitary installations. 400.00 SPA 2014-15 --- March, 2016. Balance work of east block and finishing work in progress..
2 Belonia Division Proposed construction Extension for Arya Colony H.S. School at Belonia, South Tripura. 655.38 SPA 2012-13 163.00 March, 2016. Finishing work in progress.
3 Up-gradation of Infrastructure of Rajnagar H.S. School at Rajnagar, Belonia, South Tripura. 293.00 SPA 2012-13 110.00 March, 2016. Finishing Work in Progress.
4 Proposed construction of Hrishyamukh H.S. School at Hrishyamukh, Belonia, South Tripura. 723.00 SPA-tied 2012-13 257.50 March, 2016. 80% clear site has been found.
Front Block: Structural work completed. Finishing work is in progress.
South Block: 50% of area upto plinth level and balance structural work completed upto 1st floor roof level. Roof casting work will be taken up within 7 days time.
West Block: Completed upto 1st floor lintel level.
5 Construction of Ghosh Khamar High School, Belonia, South Tripura. 908.00 --- 2015-16 --- ---

Preliminary cost estimate to be issued in next week for according A/A & E/S.

6 Up-gradation of infrastructure of Barpathari H.S. School, Belonia, South Tripura under Special Devlopment Scheme (SDS) under State Plan during the year 2015-16 (Phase-I). 600.00 SDS 2015-16 --- ---

Full sanction of A/A & E/S for Rs.600.00 lakhs accorded.

Tender called.

7 Up-gradation of infrastructure of Matai Class-XII School at Belonia, South Tripura. 150.00 SDS 2015-16 --- ---

Architectural drawing yet to be received for preparation of cost estimate.

However, A/A & E/S accorded for an amount of Rs.150.00 lakhs.

8 Up-gradation of infrastructure of Asgar Rahamanpur High School at North Rajnagar, Belonia. 662.00 --- 2015-16 --- --- Preliminary cost estimate sent to the SED on 06-02-2016 for according A/A & E/S.
9 Construction of Niharnagar H.S. School at Belonia, South Tripura. 612.00 --- 2015-16 --- -- Preliminary estimate processed to concerned Deptt. for according A/A & E/S on 30-07-2014.
10 Santirbazar Division Construction of Baikhora H.S. School at Santirbazar, South Tripura. 609.00 SPA 2014-15 --- --- Tender received and under evaluation.
10 Proposed Construction of Brintak Shiksha Niketan Building at Baikhora, Santirbazar, South Tripura /SH: Building portion including internal water supply and sanitary installation. 150.00 SCA 2012-13 82.00 March,2016. Painting and Internal Electrification work is in progress.
11 Up-gradation of infrastructure of Twikormo H.S. School, Manipathar, Santirbazar, South Tripura. --- --- 2015-16 --- --- Survey site plan is under preparation.
12 Up-gradation of infrastructure of Chandrapur Chowdhury Para High School, West Manu, Santirbazar, South Tripura. --- --- 2015-16 --- --- Survey site plan is under preparation.
NORTH DISTRICT :
1 Kanchanpur Division Construction of Jampui H.S. School at Jampui Block, Kanchanpur, North Tripura (2013-14) 635.00 SPA 2014-15 --- ---

 

Tender accepted. Work order issued. Structural drawing is under preparation.

2 Construction of Laljuri H.S. School at Kanchanpur, North Tripura (2013-14) 917.00 SPA-Tide 2015-16 --- ---

e-Tender received and under evaluation.

Up-Coming Work

3 Up-gradation of infrastructure of Kanchanpur H.S. school North Tripura under state paln (ACA) during the year 12-13/SH: Building portion including internal water supply and sanitary installation/ (balance work) phase-(I+II) 400.00 ACA 2012-13 360.00

Completed

 

March, 2016.

Phase-I= Work for 50% area completed and handed over and functioning.

Phase-II(Balance work)= Painting work completed.

4 Construction of Anandabazar H.S. School at Anandabazar, Kanchanpur, North Tripura (2013-14) 720.00 SPA 2014-15 --- ---

Tender called.

Up-Coming Work

5 Construction of Gachirampara H.S. School, Dasda, North Tripura (2013-14) 455.00 SPA 2013-14 --- ---

Tender called.

Up-Coming Work

6 Up-gradation of infrastructure development of Durgaram Reang Para H.S. School, Dasda, Kanchanpur. --- --- 2015-16 --- --- Architectural drawing yet to be received for preparation of Preliminary cost estimate.
7 Construction of Laljuri H.S. School at Kanchanpur, North Tripura (2013-14) 917.00 SPA 2014-15 145.00 ----

2nd call rejected.
e-Tender accepted by WAB.

Up-Coming Work

8 Dharnamagar Division Up-gradation of infrastructure of Dharmanagar Girl’s H.S. School under ACA/ Phase-II. 450.00 ACA 2012-13 288.21 March, 2016.

Finishing work in progress.

9 Up-gradation of infrastructure of Bagan H.S. School, Kadamtalla, North Tripura. 500.00 CASP (SPA) 2015-16 --- --- Architectural drawing yet to be received for preparation of Preliminary cost estimate.
10 Construction of 50 seated Hostel for Manipuri boys at Rajbari in Dharmanagar.   SPA Un-Tied 2012-13 --- ---

Work suspended as per discussion held in at District level meeting in DMR chaired by Hon'ble Minister HED.

Existing agreement closed.

UNAKOTI DISTRICT :
1 Kailashahar Division Construction of Kailashahar Girl’s H.S. School, Kailashahar, Tripura North/Ground Floor (except Auditorium) & 1st Floor (Fr. Block only)/SH: Building portion including internal water supply and sanitary installations (Phase-I). 900.00 NLCPR 2011-12 338.35 March,2016. North Block Completed (except colour), South block completed (except fixing of door, windows shutters, colour), Front Block-Bending & binding of grand floor roof is in progress. Finishing work in progress.
2 Up-gradation of Infrastructure of Radha Kishore Institute (R.K.I.) Kailashahar, North Tripura (2nd Phase) under State Plan during the year 2010-2011/SH. Building portion including internal water supply and sanitary installation. 500.00 SPA 2011-12 450.00

Mar.2015
(Part).

In all respect
Mar.2016

Work at finishing stage.
3 Up-gradation of Infrastructure of Kaulikura Class-XII School at Kailashahar, North Tripura under ACA during the year 2011-12/SH: Building portion including internal water supply and sanitary installations. 500.00 SPA 2011-12 250.00 Completed Work completed and handed over.
4 Construction of 100 capacity Boys Hostel for Tilla Bazar Fazil H.S. Madrassa, Kailashahar, Unakoti District, Tripura/SH: Building portion including internal water supply and sanitary installation. 457.00 SPA-Tide 2012-13 149.50 March, 2016. Work nearing completion.
5 Construction of Academic and Administrative Block for DIET at Kailashahar, Unakoti District, Tripura. 940.00 State Plan 2014-15 --- --- e-Tender (3rd call) received and will be processed to WAB for acceptance.
6 Construction of Belkunbari H.S. School under Gournagar RD Block, Kailashahar, Unakoti District (2013-2014) 575.00 SPA 2014-15 45.00

 

 

Already preliminary cost estimate prepared and being sent to SED for A/A & E/S. Sanction of A/A & E/S awaited.
7 Construction of Dulugaon H.S. School under Gournagar Block, Unakoti District, Tripura. 300.00 SPA, Tide 2014-15 --- --- Contour surveyed site plan prepared. Part amunt of Rs.300.00 lakhs A/A & E/S received.
8 Up-gradation of infrastructure of Srirampur Surjyamani H.S. School at Kailashahar. 438.00 SDS 2015-16 --- --- Tender received..
9 Kumarghat Division Up-gradation of infrastructure of Pabiacherra Class-XII School, Kumarghat. --- --- 2015-16 --- --- Architectural drawings yet to be received for preparation of Preliminary cost estimate.
10 Up-gradation of infrastructure of Fatikroy Class-XII School, Kumarghat. --- --- 2015-16 --- --- Architectural drawings yet to be received for preparation of Preliminary cost estimate.
11 Up-gradation of infrastructure of BTC Darchawi Christian G.S. School, Kumarghat. --- --- 2015-16 --- --- Drawing received.
Preliminary estimate is under preparation.
SEPAHIJALA DISTRICT :
1 Bishalgarh Division Construction of 100 capacity Boys Hostel for Bishalgarh Madrassa, Bishalgarh, Sepahijala District, Tripura/SH: Building portion including internal water supply and sanitary installation. 457.00 SPA-tied 2012-13 94.50 March, 2016. Work nearing completion.
2 Sonamura Division Proposed Construction of Boxanagar H.S. School at Boxanagar, Sonamura, Sepahijala District, Tripura undern SCA (un-tied) during the year 2012-13. 777.00 SCA (un-tied) 2013-14 --- March, 2017. Completed upto roof level except western side.
3 Proposed construction of Kathalia H.S. School at Kathalia, Sonamura, Sepahijala District, Tripura under SCA (un-tied) during the year 2012-13. 553.00 SCA (un-tied) 2013-14 --- March, 2016. Structural work completed. Finishing work in progress.
4 Construction of 100 capacity Boys Hostel for Daodarani Fazil H.S. Madrassa, Sonamura, Sepahijala District, Tripura/SH: Building portion including internal water supply and sanitary installation. 457.00 ACA 2012-13 94.50 March, 2016. 95% Building work completed. I.E. in progress.
5 Up-gradation of infrastructure development of Manaipathar High School under Kathalia Block, Sonamura. --- --- 2015-16 --- --- Architectural drawing yet to be received for preparation of Preliminary cost estimate.
6 Construction of Sonamura Girls' H.S. School Building (2nd floor), at Sonamura under Sepahijala District, Tripura/ Phase-II. 252.00 SCA (Un-Tied) 2014-15 --- --- 3rd call rejected.
4th call as e-tender received and under evaluation.
 
7 Proposed construction of building for Kalikrishna Nagar H.S. School at Sonamura, Sepahijala District, Tripura. 793.04 SCA (Un-Tied) 2014-15 --- July' 2017. Out of 4 block 1st block completed upto roof level. 2nd block upto lintel level. 3rd & 4th foundation work in progress.
8 Proposed construction of building for Taibandal H.S. School at Sonamura, Sepahijala District, Tripura. 853.00 SPA 2014-15 490.00 July' 2017 Work order issued as per earlier sanction.
Foundation work started. For addl. sanction new components are to be finalised.
9 Construction of Mohanbog H.S. School at Melaghar, Sonamura Sub-Division, Sepahijala District, Tripura. 512.20 SPA 2014-15 60.00 June, 2017. Foundation started.
10 Up-gradation of Infrastructure of Melaghar H.S. School at Sonamura, Sepahijala  District, Tripura. 613.81 SPA (Tied) 2013-14 --- Completed Work completed and handed over.
Balance fund i.e. Rs.680.00 lakhs may be released. Thereafter decision on addl. sanction of fund may be perused.
11 Bishramganj Division Construction of Sudhanwa DebBarma Memorial H.S. School at Jampuijala, Sepahijala District. 584.00 SPA, Tied 2014-15 --- --- Tender received and under evaluation.
DHALAI DISTRICT :
1 Ambassa Division Up-gradation of Infrastructure of Chandraipara H. S. School, Ambassa, Dhalai, Tripura under ACA (SPA Tied) during the year 2011-12 (1st Phase). 500.00 SPA, Tied 2013-14 449.61 July, 2016. Structure completed. Finishing work in progress.
2 Construction of Academic and Administrative Block including 150 seated Auditorium for BITE at Gandacherra, Dhalai, Tripura. 940.00 State Plan 2014-15 13.18 Aug., 2017. Foundation started.
3 Up-gradation of infrastructure of Raishyabari H.S. School under Dhalai District.(2013-14) 500.00 SPA 2014-15 --- --- DNIT is under preparation.
4 Up-gradation of infrastructure of Ganganagar High School, Ambassa, Dhalai Tripura. 350.00 SDS 2015-16 350.00 ---

Site plan submitted to the Sr. Architect, PWD.

Architectural drawing yet to be received.

A/A & E/S accorded for Rs.350.00 lakhs in July, 2015.

5 L.T. Valley Division Up-gradation of infrastructure of Chawmanu H.S. School under Dhalai District.(2013-14) 222.35 SPA 2014-15 --- May,2017.

Work order issued.

Yet to start due to clear site. Existing structure to be dismantled.
Foundation work started. For addl. sanction new components are to be finalised.

6 Kamalpur Division .Up-gradation of infrastructure of K.C. Girl's H.S. School , Kamalpur, under Dhalai District. 554.00 SPA 2014-15 --- --- Tender Called
7 Construction of Harachandra Class-XII School at Kamalpur. 100.00 SCA (un-Tied)   --- --- Architectural drawing yet to be received for preparation of Preliminary cost estimate.
KHOWAI DISTRICT
1 Teliamura Division Up-gradation of infrastructure of Teliamura H.S. School at Teliamura, Khowai District, Tripura. 600.00 SDS 2015-16 300.00 ---

DNIT is under preparation.

However, A/A & E/S accorded for an amount of Rs.600.00 lakhs in July, 2015.

2 Khowai Division Up-gradation of infrastructure of Tulasikhar Rajnagar H.S. School, Khowai. 300.00 SDS 2015-16 --- --- Architectural drawing yet to be received for preparation of cost estimate. However, A/A & E/S accorded for an amount of Rs.300.00 lakhs.
3 Up-gradation of infrastructure of Bharat Sardar Class-XII School, Champahour, Khowai. 300.00 SDS 2015-16 --- ---

DNIT issued for calling of tender.

However, A/A & E/S accorded for an amount of Rs.300.00 lakhs in July, 2015.

 

Science and Technology Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 Agartala Division No-V, Agartala Proposed Vigyan Gram at Agartala (Phase-I) 4482.00 ACA/SPA/
NLCPR
2013-14 739.00 Sep.2016 Work is in progress in all units.

 

State Forensic Science Laboratory

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
  Mohanpur Division Proposed extension of Forensic Science Laboratory building at Narsingarh, West Tripura. 212.14 --- 2015-16 --- --- Estimate processed to concerned Deptt. for A/A & E/S. Sanction of A/A & E/S awaited. However, DNIT is under preparation for Ground Floor only.

 

Tourism Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 Agartala Division No. V Construction of State Institute of Hotel Management, Catering Technology & Applied Nutrition (SIHM), Agartala, West Tripura/SH. Construction of Academic & Administrative Building (G.F. & Part of F.F.) and 50 Seated Boys’ Hostel Building ( G.F. & F.F.) including Internal water supply and Sanitary installations. 800.00 Deposit 2013-14 772.60 Completed

Main building completed.

Hostel for boys completed.

Boundary wall:- 60% completed.

NORTH DISTRICT
1 Kanchanpur Division Construction of Tourist Lodge at Phuldangsei, Jampui Hill, North Tripura. 245.00 Tourisum 2014-15. 117.03 Aug, 2016. Foundation work in progress.
SEPAHIJALA DISTRICT
1 Sonamura Division Special repair & Retrofitting and Up-gradation of Neermahal Palace at Rudrasagar, Melagarh, Sepahijala District, Tripura. 877.62 Tourisum 2014-15. 536.10 Completed Work Completed

 

Transport Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget date of completionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 Jirania Division Setting up an Institute of Driving Training & Research (IDTR) at Jirania, Agartala, West Tripura/SH: Construction of i] Academic, Administrative, Driving Laboratory and Library Building ii] Workshop Building iii] 20 Seated Hostel iv] Canteen Building." 1400.00 Transport 2012-13 353.06 March, 2016. Work at finishing stage.
2   Development of proposed Depot at T.R.T.C. Complex, Barjala, Agartala, West Tripura. 420.00   2015-16     Estimate processed to concerned Deptt. for A/A & E/S.
3   Up-gradation of Existing T.R.T.C. Depot at Krishnanagar, Agartala, West Tripura / SH: Construction of work shop. 216.22   2015-16     Estimate processed to concerned Deptt. for A/A & E/S.

 

Tribal Welfare  Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1   Re-construction of 50 seated ST Boys Hostel, Ishanpur H.S. School. 303.00 Umbrella Scheme
(MoTA)
2015-16 -- --- Model Preliminary estimate sent to concerned deptt. on 27-01-2015 for A/A & E/S.
2 Construction of 100 seated ST Girls Hostel at Lembucherra for College Students. 608.00 Umbrella Scheme
(MoTA)
2015-16 --- -- Model Preliminary estimate sent to concerned deptt. on 02-02-2015 for A/A & E/S.
DHALAI DISTRICT
1 L.T. Valley Division Construction of 50 seated ST Boy's/Girl's Hostel attached to different Govt. High/Higher Secondary Schools in Tripura during 2011-12/SH: Construction of Boys' Hostel [50 seated] & Chowkidar's Room including boundary wall of length 300 m at 82 Mile H.S. School, Manu Block, Longtharari Valley Sub-Division, Dhalai/Building portion including internal water supply and sanitary installations. 197.05 CSS Fund
(Tribal Affairs)
2011-12 250.00 May, 2016 Main building: Structure work completed. Plastering in progress. Kitchen up to plinth level.
2 Proposed Construction of 50 (fifty) seated ST Girl's Hostel Building   attached to Kathalcharra TMC H.S. School, L.T. Valley, Dhalai District, Tripura/SH: Building portion including internal water supply, sanitary installation and Boundary wall. 293.12 CSS Fund
(Tribal Affairs)
 
2014-15 200.00 ---

Site development work is in progress.

Rs.293.12 lakhs A/A & Rs.146.56 lakhs E/S received.

1   Re-construction of 100 seated ST Boys Hostel, Harachandra H.S. School. 608.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 02-02-2015 for A/A & E/S.
  Re-construction of 100 seated ST Boys Hostel, Ganganagar H.S. School. 608.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 02-02-2015 for A/A & E/S.
GOMATI DISTRICT
1 Udaipur Division Construction of 50 seated ST Girls Hostel attached to Jalemabari High School, Killa Block under Udaipur Sub-Division, Gomati District, Tripura. 293.12 CSS
 (Umbrella)
2014-15 124.28 Oct., 2016 70% work completed, rest work in progress.
1 Amarpur Division Construction of 50 seated ST Boys Hostel attached to Nutanbazar H.S. School, Amarpur Sub-Division, Gomati District. 293.12 CSS
 (Umbrella)
2014-15 105.00 Sep., 2016 Roof casting completed.
KHOWAI DISTRICT
1 Khowai Division Construction of 480 seated Eklavya Model Residential School (EMR) at Rajnagar under Khowai District, Tripura / SH: i) Construction of  double storied 240 seated Boy’s Hostel Building (Ground Floor only)  ii) Extension of double storied School Building (Ground Floor only) / Building portion including internal water supply and sanitary installation. 1600.00 Art-275(I) 2010.11 450.00 Feb., 2016 Completed except flooring and painting work.
1 Teliamura Division Construction of 50 seated ST Boy's/Girl's Hostel attached to different Govt. High/Higher Secondary Schools in Tripura during 2011-12/SH: Construction of Boys Hostel [50 seated] & Chowkidar's Room including boundary wall of length 300 m at Balaram Cobra Class-XII School, Maharanipur, Mongiakami Block, Teliamura Sub-Division, Khowai District/ Building portion including internal water supply and sanitary installations. 197.05 CSS Fund
(Tribal Affairs)
2011-12 148.50 Completed Work completed and handed over.
NORTH DISTRICT
1 Kanchanpur Division Construction of 100 seated ST Girls Hostel attached to Kanchanpur Class-XII School, Kanchanpur, North Tripura. 586.57 CSS
 (Umbrella)
2014-15 420.070 May, 2017 Work upto 1st floor level.
1   Re-construction of 100 seated ST Boys Hostel, Kanchanpur H.S. School. 608.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 02-02-2015 for A/A & E/S.
2 .Re-construction of 50 seated ST Boys Hostel, Ledrai Dewan H.S. School. 603.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 27-01-2015 for A/A & E/S..
2 .Re-construction of 50 seated ST Girls Hostel, Dasda H.S. School. 603.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 27-01-2015 for A/A & E/S.
2 .Re-construction of 50 seated ST Boys Hostel, Purnajoy C.P. H.S. School, Kanchanpur. 603.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 27-01-2015 for A/A & E/S.
SEPAHIJALA DISTRICT
1 Bishramganj Division Construction of 50 seated ST Boy's/Girl's Hostel attached to different Govt. High/Higher Secondary Schools in Tripura during 2011-12/SH: Construction of Girls Hostel [50 seated] & Chowkidar's Room including boundary wall of length 300 m at Sutarmura H.S. School, Bishalgarh Block, Sepahijala District/ Building portion including internal water supply and sanitary installations. 197.05 CSS
(Tribal Welfare)
2011-12 197.05 Completed Work completed and handed over.
2 Sonamura Division Construction of 50 seated ST Boy's/Girl's Hostel attached to different Govt. High/Higher Secondary Schools in Tripura during 2011-12/SH: Construction of Girls Hostel [50 seated] & Chowkidar's Room including boundary wall of length 300 m at Thalibari H.S. School, Kathalia Block, Sonamura Sub-Division, Sepahijala District/ Building portion including internal water supply and sanitary installations. 215.32 CSS
(Tribal Welfare)
2011-12 ---- Completed
&
handed over.
Revised preliminary cost estimate processed on 06-11-2015 for accord of A/A & E/S.
3 Bishalgarh Division Construction of 50 seated ST Boys Hostel attached to Sepahijala H.S. School, Jumpuijala Sub-Division, Sepahijala District. 293.12 CSS
 (Umbrella)
2015-16 187.200 Dec., 2016 Work upto lintel level.
4   Re-construction of 100 seated ST Boys Hostel, Bishramganj H.S. School. 608.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 02-02-2015 for A/A & E/S.
5 Re-construction of 50 seated ST Boys Hostel, NCI, Sonamura. 603.00 Umbrella Scheme
(MoTA)
2015-16 ---- --- Model Preliminary estimate sent to concerned deptt. on 27-01-2015 for A/A & E/S.
6 Re-construction of 50 seated ST Boys Hostel, Melaghar H.S. School. 603.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 27-01-2015 for A/A & E/S.
SOUTH DISTRICT
1 Belonia Division Construction of 100 seated ST Boys Hostel attached to BKI H.S. School at Belonia, South Tripura District. 586.57 CSS
 (Umbrella)
2014-15 382.011 April, 2017 Foundation work in progress upto plinth level.
2 Construction of 100 seated ST Girls Hostel attached to Belonia Girls H.S. School under Belonia Sub-Division, South Tripura. 586.57 CSS
 (Umbrella)
2014-15 385.030 April,2017. Column upto 1st floor slab level for two block.
3 Sabroom Division Construction of 100 seated ST Girls Hostel attached to Residental School run by TTWREIS at Bhuratali, Sabroom Sub-Division, South Tripura. 586.565 CSS Fund
(Tribal Affairs)
2014-15 181.600 April, 2017 Site development completed and foundation work in progress.
4 Santirbazar Division Construction of 50 seated ST Boy's/Girl's Hostel attached to different Govt. High/Higher Secondary Schools in Tripura during 2011-12/SH: Construction of Girls Hostel [50 seated] & Chowkidar's Room including boundary wall of length 300 m at Laxmichera H.S. School, Bagafa Block, Santirbazar Sub-Division, South Tripura/Building portion including internal water supply and sanitary installations. 197.05 CSS Fund
(Tribal Affairs)
2014-15 98.53 Completed Work completed and handed over.
5   Re-construction of 50 seated ST Boys Hostel, Muharipur H.S. School. 603.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 27-01-2015 for A/A & E/S.
6 Re-construction of 50 seated ST Girls Hostel, Silachari Girls H.S. School. 603.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 27-01-2015 for A/A & E/S.
7 Re-construction of 100 seated ST Girls Hostel, Udaipur Girls H.S. School. 608.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 02-02-2015 for A/A & E/S.
UNAKOTI DISTRICT
1   Re-construction of 100 seated ST Girls Hostel, Pabiacherra H.S. School. 608.00 Umbrella Scheme
(MoTA)
2015-16 --- --- Model Preliminary estimate sent to concerned deptt. on 02-02-2015 for A/A & E/S.
2   Re-construction of 100 seated ST Boys Hostel, Fatikroy H.S. School. 608.00 Umbrella Scheme
(MoTA)
2015-16 -- --- Model Preliminary estimate sent to concerned deptt. on 02-02-2015 for A/A & E/S.

Urban Development Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT :-
1 Agt. Division No.I, Agartala Construction of covered drain including two-storied Building over Covered Drain from Orient Chowmuhani to Jackson Gate for relocation of shops in the Western and Southern side of Children’s Park. 1097.00 SPA 2013-14 490.00 March, 2016.

Revised drawing for partition wall has been sent to UDD for Approval.

Finishing work in progress.

2 Agt. Division No.V, Agartala Construction of Bus Terminal at Nagerjala, Agartala under NLCPR (Phase-I)/(i) Construction of Terminal building, (ii) Construction of Rehabilitated Shops/SH: Building portion including internal water supply and sanitary installation. 1688.90 NLCPR 2014-15 608.00 June, 2016. Test piling completed on 17-10-2015. Set to CE for approval on 04.12.2015. Extra work of brick sold road about 120 mtr length completed. Layout of building in progress..
DHALAI DISTRICT :-
1 Ambassa Division Construction of 1000 seated capacity Town Hall at Ambassa, Dhalai, Tripura/SH: Building portion including internal water supply and sanitary installation. 750.00 SPA 2014-15 750.00 Frbruary, 2016. Work at finishing stage.

 

Welfare of SC's, OBC & Minority Department

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT :-
1 Agartala Division No-III,Agartala Proposed Construction of Haj Bhavan (G+3) storied at Melarmath near Nazrul Chatrabash, Agartala during the year 2013-14/SH: Building portion including internal water supply and sanitary installation. 664.85 Deposit 2013-14 286.50 March, 2016. Foundation work completed. Ground floor 60%, Second floor 50% work completed.
2 Construction of Type-I Quarters (Twin Four Storied-8 units)-32 Units [Four Block] at Harijan Colony attached to IGM Hospital, Agartala/SH: Building portion including internal water supply and sanitary installation. 351.82 SPA (Tied) 2014-15 316.80 Completed Work completed and handed over.
3 Construction of quarters (Phase-II) for Safai Karmachari at Harijan Colony, IGM Hospital, Agartala, Tripura (W). 293.00 --- 2015-16 --- --- Tender will be called soon.
4 Construction of New building for Nazrul Chatrabas of 150 nos. capacity at Agartala, West Tripura/ Construction of Front Block (Phase-II). 329.55 SPA 2014-15 775.23 --- Phase-I completed and handed over. Test pile completed.
5 --- Construction of 100 seated SC Girls Hostel attached to Anandanagar English Medium Model School, West Tripura. 590.00 Babu Jagjiban Ram Chhatrawas Yojana Scheme under CSS 2015-16 --- --- Preliminary cost estimate sent to concerned deptt. on 09-04-2015 for according A/A & E/S.
6 --- Construction of 100 seated SC Girls Hostel attached to Women's College, Agartala, West Tripura. 590.00 Babu Jagjiban Ram Chhatrawas Yojana Scheme under CSS ---- --- --- Preliminary cost estimate sent to concerned deptt. on 24-04-2015 for according A/A & E/S.
7 --- Construction of 100 seated SC Girls Hostel attached to Dr. B.R. Ambedkar Chatraniwas, Agartala, West Tripura. 590.00 Babu Jagjiban Ram Chhatrawas Yojana Scheme under CSS ---- --- --- Preliminary cost estimate sent to concerned deptt. on 24-04-2015 for according A/A & E/S.
SEPAHIJALA DISTRICT :-
1 Sonamura Division Construction of 50 seated SC Girls Hostel attached to Sonamura Girl's H.S. School, Sonamura, Sepahijala District, Tripura. 293.00 Babu Jagjiban Ram Chhatrawas Yojana Scheme under CSS -- -- ---. Preliminary cost estimate sent to concerned deptt. on 09-04-2015 for according A/A & E/S.
NORTH DISTRICT :-
1 Kumarghat Division Construction of 50 seated SC Girls Hostel attached to Pabiacherra Girl's H.S. School, Kumarghat, Unakoti District, Tripura. 293.00 ~~Babu Jagjiban Ram Chhatrawas Yojana Scheme under CSS --- -- --- ~~Preliminary cost estimate sent to concerned deptt. on 09-04-2015 for according A/A & E/S.

YOUTH AFFAIRS AND SPORTS DEPARTMENT

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme/ HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
WEST DISTRICT
1 Agartala Division No-III, Agartala. Up-gradation of Netaji Subhash Regional Coaching Centre /Construction of Indoor Gymnasium Hall at Agartala, West Tripura. 3000.00 SPA 2011-12 --- Aug.. 2016 Foundation, G.Floor, F.Floor completed. Stadium Arena 60% work completed.
2 Construction of Sports Building for different activities like Judo, Weight lifting, Yoga, Table Tennis & Indoor Batminton Court at NSRCC completed 1128.63 SPA 2012-13 --- Jan. 2016. Pile foundation completed. Ground floor work upto 30% completed.
3 Upgradation of Netaji Subhash Regional Coaching Centre [NSRCC], Agartala, Tripura/Construction of Badminton Hall/SH. Building portion including Internal water supply & Sanitary installation. 308.25 Deposit 2013-14 --- Aug.2016. Pile work finishing in progress.
4 Upgradation of Netaji Subhash Regional Coaching Centre [NSRCC], Agartala, Tripura/Construction of Swimming Pool. --- --- --- --- --- DNIT is being prepared.

Miscellaneous Works

(In Lakhs)
SL. No.DivisionName of WorksSanction CostScheme /HeadYear of SanctionedTotal Fund ReleasedTarget Date of CompletionStatus of Physical implementation/Remarks
1 2 3 4 5 6 7 8 9
DHALAI DISTRICT :-
1 Ambassa Division Infrastructural Development of Gandacherra Sub-Division, Dhalai District / Construction of Revenue Dak Bungalow. 3235.00 SCA, Un-tied 2015-16 ---- May,2017. No tender received in 1st call. 2nd call of tender is under process.
2 Infrastructural Development of Gandacherra Sub-Division, Dhalai District / 1000 seated capacity Auditorium. --- Tender accepted.
3 Infrastructural Development of Gandacherra Sub-Division, Dhalai District / Construction of Staff Quarters 36 nos. [Type-I G+2: 348 sqm (6 nos.), Type-II-g+2: 840 sqm (12 nos.), type-III-G+2: 1008 sqm (12 nos.), T-IV-G+2: 558.60 sqm (6 nos.)]. ---- Tender accepted.
4 Infrastructural Development of Gandacherra Sub-Division, Dhalai District /Construction of Police Station. ---- Site finalised. Tender will be called soon.

 

end faq

 
 
 
 
   
This site is the official website of Public Works Department(R & B),Government of Tripura.

Disclaimer  |  Legal Policy   |   All Rights Reserved.  Designed & Developed By  C-DAC  ,Pune.
          Last Modified on : Friday 11 August 2017, 18:49:40           This site is best viewed in 1280 x 1024 pixel screen resolution with Firefox 16+,IE 7+,Chrome20+.          You are visitor no. - 7